#SVML Sovereign Metals LTD – March 2026 Quarterly Report

Sovereign Metals Limited (ASX:SVM, AIM:SVML, OTCQX:SVMLF) (Sovereign or the Company) is pleased to provide its quarterly report for the period ended 31 March 2026 including advances made at its Kasiya Rutile-Graphite Project (Kasiya or the Project) in Malawi.

HIGHLIGHTS DURING AND SUBSEQUENT TO THE QUARTER

Kasiya Definitive Feasibility Study Delivers Outstanding Results

•   Pre-tax NPV8 of US$2.2 billion on capital expenditure to first production of US$727 million – an NPV to capex ratio of 3.0x

•   Steady state annual EBITDA of US$476 million and pre-tax, unlevered free cash flow of US$452 million; total revenue of US$16.2 billion initial 25-year mine life with potential for multi-generational mine life extensions

•   Operating cost of just US$450/t product (FOB Nacala) – underpinning strong margin resilience across commodity cycles

•   Positioned to become the world’s largest producer of both natural rutile (222ktpa) and natural flake graphite (275ktpa) – two commodities designated as Critical Minerals by the United States and the European Union

•   DFS completed under the oversight of the Sovereign-Rio Tinto Technical Committee, with workstreams aligned with IFC Performance Standards; World Bank/IFC Collaboration Agreement in place as potential co-lead mandated lead arranger for project financing

•   Data obtained from Pilot Mining Program, completed with technical input from Rio Tinto, provided real-world inputs and validation across key DFS workstreams

•   Heavy rare earth potential not included in DFS – evaluation of monazite by-product from rutile tailings stream now underway

Mineral Resource Estimate Significantly Upgraded

•  Total Rutile Mineral Resource increased to 2.1 billion tonnes at 0.96% rutile for 20.3Mt contained rutile, with 0.95% TGC for 20.0Mt contained graphite (Measured, Indicated & Inferred)

•  Measured and Indicated contained rutile surged 32% to 16.1Mt (1.65 billion tonnes at 0.98% rutile) – a material increase in resource confidence

•  First-ever Measured Resource declared – the highest confidence JORC Code category – covering at least the first six years of planned operations

•  Resource upgrade delivered the classification standard required for a bankable DFS and a critical milestone on the path to project financing

Offtake Momentum: Mitsui (Rutile) and Traxys (Graphite) MOUs Signed

•  Non-binding MOU signed with Mitsui for up to 70,000 tonnes per annum of Kasiya natural rutile concentrate (TiO2 >95%) over an initial four-year supply period from first production, with potential five-year extension  equates to over 50% of Phase 1 rutile production

•  Japan is the world’s second-largest producer of titanium sponge after China and supplied over 70% of US titanium sponge imports in H1 2025, underscoring the strategic importance of securing reliable natural rutile feedstock

•  Non-binding MOU signed with Traxys North America LLC – one of only three trading houses selected to procure critical minerals for the U.S. Government’s US$12 billion Project Vault strategic reserve – for approximately 40,000 tonnes per annum of Kasiya graphite in Phase 1, increasing to up to 80,000 tonnes per annum as the Project expands

•  Traxys MOU contemplates an initial focus on the high-value refractory market, with potential to include flake graphite to serve battery anode supply chains

Strategic Heavy Rare Earths Recovered at Kasiya

•  Monazite concentrate containing exceptionally elevated levels of heavy rare earth elements recovered from the rutile tailings stream at Sovereign’s Lilongwe laboratory

•  Preliminary analysis confirmed significant valuable heavy rare earth content with an average DyTb ratio of 2.9% and 11.9% Yttrium, and valuable light rare earth content, including 21.8% NdPr ratio – heavy rare earth ratio approximately 7x higher for both DyTb and Yttrium than the five largest global rare earth producing mines, suggesting potential for Kasiya to produce a very high value rare earth product

•  Monazite recovered from material that would otherwise be discarded – potential third revenue stream at near-zero incremental cost, with no parallel rare-earth processing circuit required

•  DyTb and Yttrium are all subject to Chinese export controls introduced in April 2025 and further tightened against Japan in January 2026 – the elements underpin permanent magnets for defence systems, aerospace thermal barrier coatings, radar and laser systems

Next Steps

Over the quarter ending June 2026 and beyond, Sovereign will:

•  Advance post-DFS workstreams, including finalisation of the Environmental and Social Impact Assessment

•  Advance offtake discussions and progress towards binding definitive agreements with Mitsui, Traxys and other strategic counterparties

•  Undertake further work to characterise the monazite mineralisation at Kasiya, including detailed mineralogical characterisation, assessment of heavy rare earth concentrate recovery rates through the proposed Kasiya flowsheet, and evaluation of potential scale and economics of rare earth production as a by-product

•  Continue the Company’s community and social development programs in Malawi

Enquiries

 

Frank Eagar, Managing Director & CEO

South Africa / Malawi

+27 21 140 3190

 

 

Sapan Ghai, CCO

London

+44 207 478 3900

 

 

 

Nominated Adviser on AIM and Joint Broker 

 

SP Angel Corporate Finance LLP 

+44 20 3470 0470 

Ewan Leggat 

Charlie Bouverat 

 

 

Joint Broker 

 

Stifel 

+44 20 7710 7600 

Varun Talwar 

Ashton Clanfield 

 

 

Link here to view the full announcement

#SVML Sovereign Metals Limited – Results of Meeting and Issue of Performance Rights

A General Meeting (GM) of Sovereign Metals Limited (Company) (ASX:SVM; AIM:SVML; OTCQX: SVMLF) was held today, 18 February 2026, at 11.00am (AWST).

The resolutions voted on were in accordance with the Notice of GM previously advised to shareholders. All resolutions were decided on and carried by way of poll.

In accordance with Section 251AA of the Corporations Act 2001 and ASX Listing Rule 3.13.2, the details of the poll and proxies received in respect of each resolution are set out below.

Sovereign Metals Limited (ASX:SVM; AIM:SVML; OTCQX:SVMLF) (Sovereign or the Company) advises that it has today issued 8,650,000 unlisted performance rights to Directors following shareholder approval as follows:

·      3,600,000 unlisted performance rights subject to the “Bankable Definitive Feasibility Study Milestone” expiring on or before 30 June 2026; and

·      5,050,000 performance rights subject to the “Construction and Finance Milestone” that have no exercise price and expire 30 June 2028.

Following the issue of these unlisted performance rights, the Company has the following securities on issue:

·      646,938,703 fully paid ordinary shares (of no par value);

·      4,992,500 unlisted performance rights subject to the “Grant of Mining Licence Milestone” expiring on or before 31 March 2026 (expected to lapse unvested);

·      6,190,000 unlisted performance rights subject to the “Final Investment Decision Milestone” expiring on or before 30 June 2026 (expected to lapse unvested);

·      9,022,500 unlisted performance rights subject to the “Bankable Definitive Feasibility Study Milestone” expiring on or before 30 June 2026; and

·     13,262,500 performance rights subject to the “Construction and Finance Milestone” that have no exercise price and expire 30 June 2028.

Enquiries

Dylan Browne

Company Secretary

+61 8 9322 6322

 

 

Nominated Adviser on AIM and Joint Broker 

 

SP Angel Corporate Finance LLP 

+44 20 3470 0470 

Ewan Leggat 

Charlie Bouverat 

 

 

 

Joint Broker 

 

Stifel 

+44 20 7710 7600 

Varun Talwar 

 

Ashton Clanfield 

 

 

#BRES Blencowe Resources PLC – Stage 7 Drill Program Nears Completion

Blencowe Resources Plc is pleased to announce that drilling on its 6,750 metre exploration program at its Orom-Cross graphite project in Northern Uganda is nearing completion. This drilling and exploration campaign is the latest in the Company’s ongoing definition of the resources available at Orom-Cross and targeting to deliver a material increase in both the JORC Resources and Reserves at this world class deposit.

Highlights:

·    Infill drilling 100% complete at Camp Lode and Northern Syncline deposits.

·    Exploration drilling completed on new Northern Syncline (West) target.

·    Step-out drilling at the exciting new Beehive deposit is underway.

·    Surface mapping reveals extensive near-surface ore zones which supports low-cost mining.

·    Consistent ore intersections in all holes drilled to date, with graphite continuing beyond 30 meter depth in most of them.

·    Permanent exploration camp construction advancing onsite.

·    Government approval in place for export of assay samples for testing

Camp Lode and Northern Syncline

Blencowe has completed all infill reserve drilling on the Camp Lode and Northern Syncline deposits. All core has been logged, sampled and dispatched to accredited labs in Tanzania and South Africa for assaying. Geological logging continues to confirm consistent in geology and ore zones aligned with the Company’s current Resource models.

Surface mapping during access road construction has revealed extensive areas of surface ore expressions in both deposit areas, which will translate into reduced mining costs, lower strip ratios and a quicker production ramp-up once mining begins.

Meanwhile, 70 exploration holes have been successfully drilled and logged at the new Northern Syncline (West) extension deposit.

Beehive – First Step Out Drilling

The drill rigs have now relocated south to the exciting new ‘Beehive’ deposit, the first major step-out target to be tested beyond the original two lodes being Camp Lode and the Northern Syncline. Initial indications are encouraging, with multiple deeper (+100m) holes planned to test ore continuity at depth.

The Company believe that drilling success at Beehive could further validate independent geologist’s estimates of 2-3 billion tonnes of graphite for the entire Orom-Cross deposit.  This would make Orom-Cross one of the largest graphite deposits worldwide, with a substantial portion easily accessible at shallow depths meaning lower cost mining and extraction.

General

Unseasonal weather and typical mechanical issues with drill rigs have been managed without material disruption by an experienced drilling team and are not expected to impact the timing of completion of the drill programme.

Government permission to export samples for assaying has now been granted, which will then provide results to feed into the updated Orom-Cross JORC Resource and Reserves Statement, and ultimately the Definitive Feasibility Study.

Blencowe is also continuing the establishment of a permanent exploration camp marking the first physical infrastructure onsite ahead of first production targeted for 2026, which would represent a significant achievement moving from early-stage acquisition to production in just six years.

Figure 1:  Orom-Cross Project showing drill holes at the two existing deposits as well as the new Beehive Lode (GT01a).

Executive Chairman Cameron Pearce commented:

“We are delighted to report continued success in our Stage 7 drilling program to expand and upgrade the JORC Resource.  The Beehive Lode is an exciting new step-out target that we have wanted to test with the drill bit for some time and early indications are very promising.  Our independent geologists have estimated Orom-Cross to be one of the most substantial graphite deposits worldwide and success at Beehive will further enhance our confidence in that evaluation.” 

“All of this work is integral to expanding both Resources and Reserves and will ultimately feed into the Definitive Feasibility Study underway. Importantly, this technical progress supports the commercial traction we’re now seeing with offtake partners and lays the groundwork for strategic project-level funding discussions already underway.”

For further information please contact:

 

 Blencowe Resources Plc

 Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

Sasha.sethi@blencoweresourcesplc.com

 

Tavira Financial 

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

Link here to view the full announcement.

#BRES Blencowe Resources PLC – 6,700m Drilling Programme to Commence

Blencowe Resources Plc (LSE: BRES) is pleased to announce that it has commenced the 6,700 metre resource drilling programme, marking the final major workstream required for the completion of the Definitive Feasibility Study (“DFS”) for the Orom-Cross graphite project in Uganda.

With the funding received from the recent capital raise the Company has now triggered the drilling programme, seeking a significant expansion of the JORC Standard Resource and Reserves for Orom-Cross.  The drill programme will target extensions to the existing Northern Syncline and Camp Lode deposits as well as upgrading the overall Resource classification.  There will also be a step-out campaign to outline additional resources in a nearby target zone which, if successful, will add an exciting new high grade deposit into the Orom-Cross Resource.

The additional Reserves will allow Blencowe to both increase the scale of production tonnage earlier in the mine life and to extend the life of mine, delivering a substantial impact on project economics and the final DFS results.

Highlights:

·    Value Addition: Additional resources will underscore the scale and continuity of the graphite deposit at Orom-Cross, estimated at 2-3 billion tonnes overall.

·    Step-Out: Drilling in new target areas within the tenement aims to increase mineral resource and confirm extensions within this vast graphite deposit.

·    Further Resources and Reserves: Incremental drilling on the existing deposits can significantly increase the JORC Standard Reserve, translating to higher production volumes and an extended life of mine

·    Enhanced DFS Economics: Increased production volumes and longer life of mine would have a materially positive impact on the DFS result.

 

Blencowe has commenced mobilisation and execution for its latest drilling campaign at the Orom-Cross project.  Experienced drilling partner ADT Africa (www.adtafrica.com) will once again undertake this programme, under the guidance of Minrom Consulting (www.minrom.com), Blencowe’s geological and technical partner.

The programme aims to expand both the JORC Standard Resource and Reserves, which currently stand at 24.5Mt at 6.0%TC (total carbon).  Drilling will also support data required for geotechnical design confirmation for pit designs, as well as material strength characteristics for crushing and milling designs within the DFS.

ADT Africa will now mobilise drill rigs and personnel to site shortly and commence drilling thereafter.  The entire programme is scheduled to span approximately 2-3 months, with regular market updates to follow.  A revised JORC Resource is anticipated after drilling and assays are completed.  Additionally, Blencowe will establish the first permanent camp at Orom-Cross, in preparation for the construction phase, targeted for 2H 2025.

 

Cameron Pearce, Executive Chairman, commented;

“We are confident this programme will significantly extend our JORC Resource and Reserve base and we will be working closely with our technical partners to deliver the best results possible in the shortest timeframe, feeding directly into the DFS.  We are especially excited to be drilling a new deposit which may ultimately deliver further higher grade tonnes into our project.  Higher production volumes will make a substantial difference to the NPV within the DFS modelling.” 

 

“As a result of successfully completing bulk sample test work over the past 12 months to become pre-qualified, combined with our evolving downstream SPG strategy that will give Orom-Cross a nearby offtaker for life of mine, we can now expect sell more product than we originally believed was possible within the PFS.  This increase in demand supports our decision to build up Reserves beyond initial PFS expectations, aligning with the significant market need for high-quality graphite.”

 

 

For further information please contact:

 

  Blencowe Resources Plc

Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Financial 

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit.  Blencowe completed a successful Pre-Feasibility Study on the Project in July 2022 and is now within the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with an initial JORC Indicated & Inferred Mineral Resource of 24.5Mt @ 6.0% TGC (Total Graphite Content). This Resource has been defined from only ~2% of the total tenement area which presents considerable upside potential ahead.  Development of the resource is expected to benefit from a low strip ratio and free dig operations together with abundant inexpensive hydro-electric power off the national grid, thereby ensuring low operating costs.  With all major infrastructure available at or near to site the capital costs will also be relatively low in comparison to most graphite peers.

In 3Q 2024 Blencowe introduced a Joint Venture concept with experienced downstream graphite processing partners to ultimately produce upgraded 99.95% SPG in Uganda.  This strategy has several key advantages plus substantial cost savings which will assist deliver a world class project once DFS is completed.

#SVML Sovereign Metals LTD – Hydraulic Mining Trial Commences

HYDRAULIC MINING TRIAL COMMENCES

·     Hydraulic mining trial has now commenced at Kasiya Pilot Site as part of ongoing Optimisation Study

·   Trial is being conducted by Fraser Alexander, a global industry leader in hydraulic mining, following successful completion of dry mining trial in July 2024

·    Hydraulic mining trial is expected to take approximately three months to complete and includes backfilling of main trial pit, deposition and rehabilitation testwork

·     Previous testwork suggests soft, friable nature of Kasiya orebody should be suitable for hydraulic mining

·     Pilot Phase continues to progress with oversight from Sovereign-Rio Tinto Technical Committee

·   Rio Tinto has elected to increase its shareholding to 19.9% via an additional investment of A$0.7 million in Sovereign

 

A large open pit with a water pipe Description automatically generated with medium confidence

Figure 1: Hydraulic mined material (slurry) flows freely to the collection point in the bottom of the sump.

Sovereign Metals Limited (ASX: SVM; AIM: SVML; OTCQX: SVMLF) (Sovereign or the Company) is pleased to announce the commencement of a hydraulic mining trial at its Kasiya Rutile-Graphite Project (Kasiya or Project) in Malawi as part of the ongoing Pilot Mining and Land Rehabilitation Program (Pilot Phase). The hydraulic mining trial aims to further develop previous testwork as part of the Kasiya Optimisation Study.

Managing Director and CEO, Frank Eagar commented: “With valuable insights gained from the dry-mining approach at Kasiya, we are now entering the next phase, which includes the commencement of the hydraulic mining tests, processing and backfilling material, and progressing towards the rehabilitation phase, which we expect to take three months to complete. Results from the Pilot Phase, in particular the analysis of dry-mining versus hydraulic mining, will be fundamental for the ongoing Optimisation Study.”

Classification 2.2: This announcement includes Inside Information

RIO TINTO TO INCREASE ITS SHARHOLDING TO 19.9%

On 17 July 2023, the Company announced that Rio Tinto Mining and Exploration Limited (Rio Tinto) had made an investment of $40.4 million in the Company through the issue of 83,095,592 fully paid ordinary shares (Shares) and 34,549,598 unlisted Options (Rio Tinto Options).

On 3 July 2024, the Company announced that Rio Tinto had exercised the Rio Tinto Options and the Company subsequently issued 34,549,598 Shares to Rio Tinto to raise an additional $18.5 million (before costs).

Rio Tinto has advised the Company that it has elected to make an additional investment of A$690,360 in Sovereign through the issue of 1,290,392 Shares (Additional Shares) to Rio Tinto pursuant to Rio Tinto’s first right of refusal on equity issues in accordance with the Investment Agreement between Rio Tinto and the Company dated 16 July 2023. Subject to the issue of Additional Shares, Rio Tinto will increase its shareholding in Sovereign to 19.9%.

HYDRAULIC MINING TRIAL

The saprolite-hosted mineralisation at Kasiya is predominantly homogenous, with consistent physical properties across the 1.8 billion tonne Mineral Resource Estimate. Pilot Phase data from the dry-mining trial has confirmed that no drilling, blasting, crushing, grinding, or milling is needed before stockpiling material for processing into rutile and graphite products.

The temporary water storage pond, constructed and sealed with natural clay from excavated material, has been filled with six million litres of ground water, predominantly from eight water boreholes on site. This water will be used during the hydraulic mining trial and continuously recycled from the constructed holding cells where sand and fines fractions will be stored respectively prior to the planned deposition and rehabilitation testwork.

Figure 2: Overview of the hydraulic mining trial.

All hydraulic mining equipment is skid-mounted for ease of operation and mobility. A barge-mounted pump, transports the slurry from the sump to a vibrating screen.

A blue object in a river Description automatically generated

Figure 3: A pump, mounted to a barge, pumps the slurry to a vibrating screen.

Screen underflow is collected in a screen underpan and pumped through a stacker cyclone. The cyclone generates a -45 micron slurry on the overflow and a +45 micron sand on the underflow. This process is designed to replicate plant conditions where these fractions are produced as tailings, and will be used in subsequent in-pit deposition test work.

The overflow slurry is transferred to a settling pond, where it will settle, allowing for the recovery of approximately 34% of the water, which will be returned to the water storage pond. The concentrated slurry, along with the sand discharge from the cyclone underflow, will be used for the next set of tests in the in-pit deposition phase.

Land rehabilitation will be a key part of the ongoing Optimisation Study. Sovereign’s objective is to restore land post mining to conditions that match or surpass existing agricultural yields. The Pilot Phase will showcase to local communities the successful rehabilitation of land for agriculture post-mining. These efforts will also help Sovereign refine excavation and backfill techniques.

Blending test work will commence after the completion of the hydraulic mining tests. This phase will involve backfilling the seven individual test pits using various ratios of fines and sand to be followed by soil remediation and rehabilitation testwork.

Several machines in a field Description automatically generated

Figure 4: The train of high-pressure pumps used to drive the water monitor are skid-mounted.

Figure 5: +2mm oversize is screened out using a vibrating screen.

 

ENQUIRIES

Frank Eagar (South Africa/Malawi)
Managing Director

+27 21 065 1890

Sam Cordin (Perth)
Business Development

+61(8) 9322 6322

Sapan Ghai (London)
CCO

+44 207 478 3900

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

 

 

Joint Brokers

 

Stifel

+44 20 7710 7600

Varun Talwar

 

Ashton Clanfield

 

 

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Buchanan

+ 44 20 7466 5000

Competent Person Statement

The information in this announcement that relates to the Mineral Resource Estimate is extracted from an announcement dated 5 April 2023 entitled ‘Kasiya Indicated Resource Increased by over 80%’ which is available to view at www.sovereignmetals.com.au and is based on, and fairly represents information compiled by Mr Richard Stockwell, a Competent Person, who is a fellow of the Australian Institute of Geoscientists (AIG). Mr Stockwell is a principal of Placer Consulting Pty Ltd, an independent consulting company. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this announcement have not been materially changed from the original announcement.

Kasiya Total Indicated + Inferred Mineral Resource Estimate at 0.7% rutile cut-off grade

Classification

Resource
(Mt)

Rutile Grade
(%)

Contained Rutile
(Mt)

Graphite Grade (TGC) (%)

Contained Graphite
(Mt)

Indicated

 1,200

1.0%

12.2

1.5%

18.0

Inferred

 609

0.9%

5.7

1.1%

6.5

Total

 1,809

1.0%

17.9

1.4%

24.4

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as “expects”, “anticipates”, “believes”, “projects”, “plans”, and similar expressions. These forward-looking statements are based on Sovereign’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 (‘MAR’). Upon the publication of this announcement via Regulatory Information Service (‘RIS’), this inside information is now considered to be in the public domain.

#SVML Sovereign Metals LTD – Dry Mining Trial Successfully Completed

DRY MINING TRIAL SUCCESSFULLY COMPLETED AT PILOT PHASE TEST PIT

·   Pilot Phase dry mining trial confirms Kasiya can be efficiently mined using standard mobile excavators and trucks, demonstrating operational alternatives as part of ongoing PFS Optimisation Study

·     Test pit mined as planned and on schedule to a depth of 20 metres, excavating approximately 170,000 bench cubic metres

·   Simple and efficient dry mining undertaken with free-dig and soft, friable nature of the Kasiya orebody confirming no drilling or blasting required for excavation

·   Ore extracted with zero strip ratio successfully stockpiled with no requirement to crush or grind prior to use as processing plant feed

·    Hydraulic mining trials to begin in coming weeks with six million litre water storage pond currently filled to 80% capacity

·   Pilot Phase continues to progress as part of ongoing PFS Optimisation Study with oversight from Sovereign-Rio Tinto Technical Committee·

Classification 2.2: This announcement includes Inside Information

A large open pit with many layers of dirt Description automatically generated with medium confidence

Figure 1: Kasiya Pilot Phase Test Pit mined to 20 metres depth

Sovereign Metals Limited (ASX: SVM; AIM: SVML; OTCQX: SVMLF) (Sovereign or the Company) is pleased to announce that the dry mining trial is now complete with a test pit successfully excavated as part of the ongoing Pilot Mining and Land Rehabilitation Program (Pilot Phase) at the Company’s Kasiya Rutile-Graphite Project (Kasiya) in Malawi.

The test pit covers the planned area of 120 metres by 110 metres and has been excavated to a depth of 20 metres through the weathered ore at Kasiya. This confirms Kasiya ore can be efficiently mined using conventional dry-mining techniques and a simple mobile excavator fleet. The pit is accessible through a 10-metre-wide ramp constructed at appropriate geotechnical angles.

Managing Director, Frank Eagar commented: “Completion of the test pit at this scale marks a significant achievement. The mining, hydrology and geotechnical data collected throughout is invaluable in our understanding of the orebody and the simplicity of a potential dry-mining operation at Kasiya. We now look forward to the next steps of the pilot phase including the hydraulic mining trial, cyclone separation of ore, backfilling of test pits and soil rehabilitation.”

For the test pit, the dry mining fleet consisted of four excavators, 20 trucks and a support fleet including two bulldozers and a motor grader. The saprolite-hosted mineralisation at Kasiya is largely homogenous and has relatively consistent physical properties throughout the 1.8 billion tonnes Mineral Resource Estimate. Data collected from the pilot phase confirmed that no drilling, blasting, crushing, grinding or milling will be required prior to stockpiling material for processing into rutile and graphite products; an indication of potentially lower mining costs and a lower carbon footprint comparable to hard rock deposits.

Figure 2: Kasiya mining and front-end processing vs. hard rock peers

A construction vehicle in a quarry Description automatically generated with medium confidenceA construction vehicle in a quarry Description automatically generated

Figures 3 & 4: Simple excavator fleet mining the test pit

Approximately 170,000 bench cubic metres of material has been mined as part of the test-pit program. Steady-state operations envisage 24 million tonnes of material being mined annually. The test pit material will be processed through cyclones on-site for deposition testwork.

An aerial view of a large land Description automatically generated

Figure 5: Dry mining plant feed stockpiled without any crushing or grinding

A large dirt pit with a pond Description automatically generated with medium confidence

Figure 6: Pilot Phase Water Storage Pond almost at capacity with rehabilitation demonstration pits in background

The main pit will be backfilled with dry material, while material from hydraulic mining will be used to fill rehabilitation pits as part of the rehabilitation phase.

A temporary water storage pond has been constructed and sealed using natural clay from excavated material, minimising the use of conventional plastic lining. The pond is being filled via eight boreholes delivering water to site and is nearing its capacity of six million litres. Water from the storage pond will initially be used for the hydraulic mining stage. 

An aerial view of a construction site Description automatically generated

Figure 7: Pilot Phase Site end of July 2024

Background to the Pilot Phase

The Pilot Phase is a critical part of Kasiya’s optimisation study; empirical data generated from the Pilot Phase will determine optimal project excavation, material handling, processing, backfilling and rehabilitation approaches. The Pilot Phase is being undertaken on a 9.9-hectare site and includes the following activities:

1.    Test Pit: A test pit of 120m by 110m excavated to a depth of 20m, allowing optimisation of hydraulic and dry mining excavation methods.

2.    Stockpiles: The excavated material will be temporarily stored in 4 stockpiles, namely all dry mining material, wet slimes (in a pond) and two sizes of sand fractions from the hydraulic mining.

3.    Backfilling and Grading: The material will be placed back into the pit, and all areas will be graded.

4.    Rehabilitation Demonstration: Sovereign will construct eight small rehabilitation demonstration pits covering a combined area of 100m by 130m. These will be used for water storage, excavated material storage, and demonstration of multiple rehabilitation approaches.

5.    Temporary Laydown Areas: Four areas will be used as temporary laydown areas, offices, and associated infrastructure.

6.    Communication: The Pilot Phase will be an educational opportunity for Project stakeholders. Sovereign will undertake a series of stakeholder visits and consultations for this purpose.

Sovereign’s objective is to restore land after mining to conditions that achieve the same or better agricultural yields than existing land uses and crop yields. The Pilot Phase will demonstrate to local communities the successful rehabilitation of land for agricultural use post-mining; land rehabilitation will form an integral component of the ongoing optimisation study. Results will also allow Sovereign to determine optimal excavation and backfill approaches, providing critical information for the upcoming Definitive Feasibility Study.

ENQUIRIES

Frank Eagar (South Africa/Malawi)
Managing Director

+27 21 065 1890

Sam Cordin (Perth)
Business Development

+61(8) 9322 6322

Sapan Ghai (London)
CCO

+44 207 478 3900

 

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

 

 

Joint Brokers

 

Stifel

+44 20 7710 7600

Varun Talwar

 

Ashton Clanfield

 

 

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Buchanan

+ 44 20 7466 5000

Competent Person Statement

The information in this announcement that relates to the Mineral Resource Estimate is extracted from an announcement dated 5 April 2023 entitled ‘Kasiya Indicated Resource Increased by over 80%’ which is available to view at www.sovereignmetals.com.au and is based on, and fairly represents information compiled by Mr Richard Stockwell, a Competent Person, who is a fellow of the Australian Institute of Geoscientists (AIG). Mr Stockwell is a principal of Placer Consulting Pty Ltd, an independent consulting company. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this announcement have not been materially changed from the original announcement.

Kasiya Total Indicated + Inferred Mineral Resource Estimate at 0.7% rutile cut-off grade

Classification

Resource
(Mt)

Rutile Grade
(%)

Contained Rutile
(Mt)

Graphite Grade (TGC) (%)

Contained Graphite
(Mt)

Indicated

 1,200

1.0%

12.2

1.5%

18.0

Inferred

 609

0.9%

5.7

1.1%

6.5

Total

 1,809

1.0%

17.9

1.4%

24.4

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as “expects”, “anticipates”, “believes”, “projects”, “plans”, and similar expressions. These forward-looking statements are based on Sovereign’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 (‘MAR’). Upon the publication of this announcement via Regulatory Information Service (‘RIS’), this inside information is now considered to be in the public domain.

 

#SVML Sovereign Metals Ltd – Kasiya Optimisation Advances to Pilot Phase

Sovereign Metals #SVML – KASIYA OPTIMISATION ADVANCES TO PILOT PHASE

·   

Sovereign to immediately commence a pilot mining and land rehabilitation program (“Pilot Phase”) at Kasiya as part of the ongoing Optimisation Study

·   

Empirical data generated from the Pilot Phase will assist towards determining optimal excavation, material handling, processing, backfilling and rehabilitation approaches

·   

Sovereign will excavate approximately 150,000 bench cubic metres of ore from a test pit over a three-month period using a combination of dry and hydraulic mining techniques

·   

Excavated material will be processed on-site and at Sovereign’s laboratory in Malawi and will also provide additional bulk samples for graphite product qualification

·   

The test pit will be backfilled, and multiple rehabilitation strategies will be implemented to demonstrate successful restoration of agricultural land

·   

Demonstrates strong support for mining projects in Malawi with all required approvals and community permissions for the Pilot Phase obtained within three months

A close up of sand Description automatically generated

Figure 1: Natural concentration of heavy minerals at surface at Kasiya (Source: C12 Consultants)

Managing Director Frank Eagar commented: “Advancing to a Pilot Phase is an important milestone for Kasiya. This covers the full spectrum of engineering and design, logistics, materials handling, water and environmental approvals, stakeholder engagement, livelihood restoration, tailings management and land rehabilitation. The successful permitting is a testament to the strong owner’s team we have assembled. We are progressing Kasiya into a totally new phase of development. The scale and results from this phase will significantly enhance our knowledge base from the previous laboratory-based studies. I want to thank the Malawi Government for an efficient approvals process, demonstrating just how important Kasiya is to all stakeholders.”

Classification 2.2: This announcement includes Inside Information

Sovereign Metals Limited (ASX:SVM; AIM:SVML) (the Company or Sovereign) is pleased to announce that the Company has initiated a Pilot Mining and Land Rehabilitation Program at its Kasiya Rutile-Graphite Project (Kasiya or Project) in Malawi.

The results will allow Sovereign to determine optimal excavation, backfill and land rehabilitation approaches. The Pilot Phase will be a demonstration to local communities of the successful rehabilitation of land for agricultural use post-mining. Results will also provide critical information for the upcoming Definitive Feasibility Study (DFS) and once commenced, it will shorten the time to its completion.

The objectives of the Pilot Phase include:

·    Optimisation of mining methods by construction of a pilot-scale open pit close to the maximum depth of the current reserves at 20m;

·   Scale-up of existing in-country processing capability by installation of commercial scale spirals to produce additional bulk samples for graphite product qualification;

·      Optimising the tailings management and storage designs; and

·      Optimising land rehabilitation, soil restoration and selection of revegetation species.

The commencement of the Pilot Phase follows the receipt within three months of all relevant approvals and permissions from the Malawi Environment Protection Authority (MEPA), National Water Resources Authority (NWRA), the Ministry of Mines, and the local community.

The Pilot Phase will be undertaken on a 9.9-hectare site and will include the following activities:

1.    Test Pit: A test pit of 120m by 110m will be excavated to a depth of 20m, allowing optimisation of hydraulic and dry mining excavation methods.

2.  Stockpiles: The excavated material will be temporarily stored in 4 stockpiles, namely all dry mining material, wet slimes (in a pond) and two sizes of sand fractions from the hydraulic mining.

3.    Backfilling and Grading: The material will be placed back into the pit, and all areas will be graded.

4.  Rehabilitation Demonstration: Sovereign will construct eight small rehabilitation demonstration pits covering a combined area of 100m by 130m. These will be used for water storage, excavated material storage, and demonstration of multiple rehabilitation approaches.

5.    Temporary Laydown Areas: Four areas will be used as temporary laydown areas, offices, and associated infrastructure.

6.    Communication: The Pilot Phase will be an educational opportunity for Project stakeholders. Sovereign will undertake a series of stakeholder visits and consultations for this purpose.

Kasiya is the world’s largest natural rutile deposit and the second-largest flake graphite deposit. Sovereign aims to develop a low-CO2 and sustainable operation to supply highly sought-after natural rutile and graphite to global markets.

Results of the PFS, released in late 2023, demonstrated Kasiya’s potential to become the world’s largest rutile producer at 222kt per annum and one of the world’s largest natural graphite producers (ex-China) at 244kt per annum.

The PFS delivered compelling economics with a post-tax NPV8 of US$1.6 Billion and a post-tax IRR of 28%. This long-life, multi-generational operation generates over US$16 Billion of revenue based on an initial 25-year life-of-mine and delivers an average annual EBITDA of US$415 Million per annum.

Pilot Phase Program Design

Activities have been designed to establish a 9.9-hectare site over the current Ore Reserve defined in the Kasiya PFS, covering a mineralised zone with soil conditions deemed representative of the overall Mineral Resource Estimate (MRE). Over approximately three months, Sovereign will excavate several test pits and collect geological and geotechnical samples. The main pit will be backfilled with dry material, while material from hydraulic mining will be used to fill the remaining pits as part of the rehabilitation phase.

Land rehabilitation will form an integral component of the DFS. Sovereign’s objective is to restore land after mining to conditions that achieve the same or better agricultural yields than existing land uses and crop yields. For this reason, the Company will undertake field-based demonstrations of rehabilitation showcasing drying times, soil recoveries, soil nutrients, growth variants, and including different soil inputs and revegetation methods.

Site Construction

Prior to the establishment of site infrastructure, eight boreholes have been permitted and drilled using a locally appointed drilling contractor. These boreholes will supply water to the site, which will be stored in a temporary water storage pond.

A perimeter fence will be erected around the site to maintain the necessary health and safety standards. Existing roads will be used for access to the site and, if required, improved through grading.

Temporary buildings such as offices and stores will be brought to the site on flatbed lorries and erected. To support pilot mining, two 1MW mobile diesel-powered electricity generators will be installed to provide the electricity required for high-pressure water monitors.

Pilot Mining

The main pit will be excavated using conventional load and haul to 20m depth to develop a sump to test hydraulic mining to the full depth of the current Ore Reserves. The excavated material will be temporarily stored in stockpiles.

On-Site Processing Facility

Material mined from the test pit will be processed on-site and at the Company’s laboratory facility in Lilongwe. As previously announced (Please refer to announcement dated 1 May 2024 entitled “Sovereign to Increase Bulk Sample Preparation Capacity”), as part of the Pilot Phase, a commercial-scale spiral plant will be installed at site in Malawi.

Rutile and graphite concentrate samples generated from the Pilot Phase will be shared with potential off-takers and end-users, and used for further testwork as part of the Company’s graphite commercialisation strategy.

Rehabilitation Phase

This phase will consist of establishing a strong soils baseline, backfilling of the test pit with different soil compositions, rehabilitation tests, revegetation with plants, and the improvement of soil conditions post-mining.

Regular monitoring and evaluation of the rehabilitation activities will be undertaken to assess the progress of vegetation growth and soil stabilisation. Following the conclusion of the rehabilitation, the proposed project site will be returned to farmland.

Figure 2: Site layout

Permitting

Permissions for the Pilot Phase were received following the successful submission of an Environmental and Social Management Plan to MEPA. Sovereign is committed to the responsible development of Kasiya. The Pilot Phase will be undertaken in accordance with Malawian Law and IFC Performance Standards, which will include protecting local communities and the natural environment.

ENQUIRIES

Frank Eagar (South Africa/Malawi)
Managing Director

+61(8) 9322 6322

Sam Cordin (Perth)
+61(8) 9322 6322

Sapan Ghai (London)
+44 207 478 3900

 

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

 

 

Joint Brokers

 

Stifel

+44 20 7710 7600

Varun Talwar

 

Ashton Clanfield

 

 

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Buchanan

+ 44 20 7466 5000

#SVML Sovereign Metals LTD – Kasiya Pre-Feasibility Study Results Presentation

KASIYA PRE-FEASIBILITY STUDY RESULTS PRESENTATION

Sovereign Metals Limited (Sovereign or the Company) (ASX:SVM, AIM:SVML) is pleased to advise that a presentation entitled ‘Kasiya Pre-Feasibility Study Results Presentation’ is available to download from the Company’s website at: http://sovereignmetals.com.au/company-presentations/.

 

ENQUIRIES

Dr Julian Stephens (Perth)
Managing Director

+61(8) 9322 6322

Sam Cordin (Perth)
+61(8) 9322 6322

Sapan Ghai (London)
+44 207 478 3900

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

Harry Davies-Ball

 

 

Joint Brokers

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Tavistock PR

+44 20 7920 3150

 

#BRES Blencowe Resources PLC – Receipt of $1m Grant First Tranche from DFC

Blencowe receives first US$1 Million Grant funding from Development Finance Corporation for Orom-Cross Graphite Project

Initial 20% Mobilisation tranche paid to Blencowe for Project Feasibility Costs

Blencowe Resources Plc (“Blencowe” or the “Company”) (LSE: BRES) is pleased to announce it has received its first US$1 million mobilisation tranche payment from the Development Finance Corporation (“DFC”).  This represents 20% of the full US$5 million DFC grant for Definitive Feasibility Study (“DFS”) costs, recently completed and announced by Blencowe.

Blencowe announced on 22 September that the Company had secured a US$5 million grant from tier one funding provider DFC to cover a substantial part of the DFS costs for the Orom-Cross Project.  Furthermore, DFC is now the lead mandated partner to deliver a full funding solution for Orom-Cross production, assuming completion of a successful DFS.

Blencowe is confident that this unique strategic relationship will now open doors to unlock additional value at Orom-Cross by expanding the project in ways previously considered not possible due to capital constraints.

Orom-Cross is one of the largest graphite projects worldwide by size and scale of deposit and a 21 year Mining License has already been awarded.  Blencowe took the project through a successful Pre-Feasibility Study in 2022 and is now embarked on the Definitive Feasibility Study as it drives towards decision to mine.  Metallurgical test results by leading graphite industry experts in South Africa, Canada, Australia and China have all underlined Orom-Cross graphite as upgrading to one of the cleanest, purest high grade concentrates of any graphite project, with an excellent mix of both coarse and smaller flakes.  This has recently been confirmed again on a commercial scale within the 100 tonne bulk sample test programme conducted at one of the leading graphite producer’s facility in China.

 

Cameron Pearce, Executive Chairman commented;

This first US$1 million received is of significance firstly because it is completely undilutive funding for Blencowe and its shareholders, and secondly because it solidifies the critical strategic relationship that has been developed between our Company and the DFC.  I would like to emphasise once again that the Grant Agreement with DFC does not require Blencowe to match funds input by them.  Their US$5 million funding is provided via this initial mobilisation tranche and thereafter by further tranches that are paid upon Blencowe achieving as-agreed milestones, which are all key deliverables within the DFS program.  We are already well advanced in our achievement of the next milestone which would access and release another US$1 million payment from DFC.”

 

Mr Pearce added “The DFC Grant Agreement also has no pre-set marketing restrictions and we remain committed to achieving the best offtake partnerships for our products wherever they may be.  Our bulk sample pre-qualification process is well underway and we have considerable offtake interest from recent marketing in China. We look forward to the completion of critical SPG testing in USA to prove that Orom-Cross can ultimately produce an efficient 99.95% uncoated battery-ready product for the anode market which will then lead to further OEM SPG testing as part of our DFS.”

 

For further information please contact:

 

 

  Blencowe Resources Plc

Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Financial 

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

 

First Equity Limited

Jason Robertson

Tel: +44(0)20 7330 1833

jasonrobertson@firstequitylimited.com

#ORPH Open Orphan plc – Positive in vitro results for FLU-v published

Open Orphan plc (AIM: ORPH), (to be renamed hVIVO plc (AIM: HVO) effective 26 October 2022), a rapidly growing specialist contract research organisation (CRO) and world leader in testing infectious and respiratory disease products using human challenge clinical trials, announces that positive data from a peer-reviewed study evaluating the in vitro efficacy of FLU-v, Imutex Limited’s (“Imutex”) broad spectrum influenza vaccine, has been published in the scientific journal Vaccines.1

 

Previous clinical studies have demonstrated that FLU-v induced increased antibody and cellular responses in vivo. This placebo-controlled study evaluated the ability of FLU-v to induce cellular effector functions and cross-reactivity (both measures of the immune response, with cross-reactivity being particularly important for protection against multiple viral strains) of immune cells extracted from participants, following exposure to five different influenza strains.

 

The study found that measurements of IFN-γ and granzyme B production in stimulated immune cells from participants that had been previously vaccinated with either FLU-v or placebo, were significantly higher in the FLU-v group both when stimulated with vaccine antigen and also with antigens from a panel of seasonal and pandemic inactivated influenza A and B strains. These results further support the continued development of FLU-v as a broad-spectrum influenza vaccine.

FLU-v is owned by Imutex, a joint venture between hVIVO and PepTcell Limited (the legal name of SEEK Group), to develop vaccines against influenza and mosquito borne diseases such as Zika virus, malaria and other flaviviruses.

Seasonal influenza causes significant morbidity and mortality each year and a pandemic influenza continues to pose a worldwide threat. Influenza is a serious global health threat with an estimated 1 billion cases per year, 3-5 million severe cases and 290,000 – 650,000 deaths per year.

 

Dr Andrew Catchpole, Chief Scientific Officer of hVIVO, said: “It is encouraging to see further positive data for FLU-v, supporting its continued development as a broad-spectrum influenza vaccine. There is a large unmet need for a broad-spectrum vaccine to help battle emerging seasonal and pandemic influenza A and B viruses. Although FLU-v had already produced successful Phase II clinical data, this in vitro study is particularly important as it showed the ability of the candidate to induce an immune response against a diverse variety of influenza A and B strains.”

 

 

1. Oftung, F.; Næss, L.M.; Laake, I.; Stoloff, G.; Pleguezuelos, O. FLU-v, a Broad-Spectrum Influenza Vaccine, Induces Cross-Reactive Cellular Immune Responses in Humans Measured by Dual IFN-γ and Granzyme B ELISpot Assay. Vaccines 2022, 10, 1528. https://doi.org/10.3390/vaccines10091528  

 

 

For further information please contact:

 

Open Orphan plc

+44 (0) 20 7756 1300

Yamin Khan, Chief Executive Officer

 

Walbrook PR (Financial PR & IR)

Stephanie Cuthbert / Phillip Marriage /
Louis Ashe-Jepson

+44 (0)20 7933 8780 or openorphan@walbrookpr.com

+44 (0) 7796 794 663 / +44 (0) 7867 984 082 /
+44 (0) 7747 515 393

I would like to receive Brand Communications updates and news...
Free Stock Updates & News
I agree to have my personal information transfered to MailChimp ( more information )
Join over 3.000 visitors who are receiving our newsletter and learn how to optimize your blog for search engines, find free traffic, and monetize your website.
We hate spam. Your email address will not be sold or shared with anyone else.