Home » Posts tagged 'premium'
Tag Archives: premium
#BRES Blencowe Resources PLC – Further Battery Testing Success
Blencowe Resources Plc (LSE: BRES), the natural resources company advancing the Orom-Cross graphite project in Uganda is pleased to announce continued international testing of graphite from its Orom-Cross project in Uganda has confirmed superior performance across multiple battery technologies.
Highlights:
· Latest testing by Apollo Energy Systems Inc. (“Apollo”) shows Orom-Cross graphite delivers ~12% enhanced performance in lead-acid battery cells.
· Best performing materials are purified by-products from the SPG process opening new high-value outlet for secondary graphite streams.
· The lead-acid battery market consumes over 50,000 tonnes of graphite annually across the U.S., Europe and Australia (entirely outside China’s supply chain).
· These results complement earlier testing by American Energy Technologies (“AETC”) under the EU-funded SAFELOOP programme, where Orom-Cross graphite achieved 99.98 wt%C purity and was used to produce EV anode materials containing over 68% natural graphite, delivering exceptional performance consistency.
· Ongoing testing programmes (including those undertaken for certain U.S. agencies through technical partners) continue to highlight Orom-Cross as a source of premium, high-performance graphite.
Testing by Apollo, a U.S. leader in advanced lead-acid battery innovation, demonstrated that Orom-Cross graphite enhances discharge capacity by approximately 12% versus peer materials. When added as a 2 wt.% component in the negative electrode Orom-Cross graphite improved:
· Energy capacity
· Charge acceptance
· Resistance to sulfation
· Overall cycle life
These outcomes highlight the opportunity to expand into the large, established lead-acid battery market, used in vehicles, grid storage and backup systems globally. Importantly, the materials tested are by-products from the SPG (Spheronised Purified Graphite) process, showing that even secondary streams from Orom-Cross deliver commercial-grade, high-performance value.
This follows outstanding earlier results from AETC in Chicago, which conducted pilot-scale purification and anode testing using Orom-Cross graphite within the SAFELOOP programme. The material was purified to 99.98 wt%C, achieving battery-grade purity suitable for electric vehicle applications. Anode materials containing over 68% natural Orom-Cross graphite, replacing predominantly synthetic graphite inputs used in most EV batteries, delivered performance levels that exceeded expectations, confirming Orom-Cross graphite’s exceptional electrochemical characteristics.
Combined, these independent studies by leading graphite technical experts continue to demonstrate Orom-Cross’s rare combination of high purity, superior conductivity, and multi-market adaptability, which are all qualities sought by energy storage and defence-related agencies worldwide.
Executive Chairman Cameron Pearce commented:
“We have extensive testing underway in multiple locations worldwide, using different partners with deep technical expertise in their respective fields. This latest programme with Apollo Energy has opened a potential new market opportunity for Orom-Cross graphite in the large, well-established lead-acid battery sector.
These latest results further confirm what sets Orom-Cross apart and specifically that our graphite material substantially enhances performance delivering higher capacity, greater charge acceptance and longer battery life. This means Orom-Cross graphite can add real value in a market that already consumes tens of thousands of tonnes of graphite each year and operates outside the Chinese supply chain.
These findings build on earlier work by American Energy Technologies under the SAFELOOP programme, where Orom-Cross achieved 99.98 wt%C purity and recorded the highest performance score ever seen by AETC for a natural graphite project. Together, they reinforce Orom-Cross as a globally competitive, next-generation graphite source suited to multiple battery technologies.
As we move towards completion of our Definitive Feasibility Study these ongoing results are helping shape our marketing strategy and early offtake discussions, particularly in higher value western markets. They continue to validate the quality of our product and demonstrate how Orom-Cross can meet a wide range of high-value, high-performance graphite demand globally.”
Appendix – Test Results Summary
Figure 1. Last Seven Cycles Comparison – Blencowe vs Control (HE-1511)
The chart below illustrates the clear and consistent performance advantage of Orom-Cross graphite over the control material across the final seven discharge cycles, confirming stronger energy retention and reduced performance degradation over time.

Discharge Capacity Comparison – Average 12.6% Improvement
|
Cycle # |
1 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
|
|
HE-1511 |
79.62 |
77.16 |
77.38 |
76.78 |
75.13 |
74.47 |
75.01 |
74.85 |
75.73 |
mAh/g NAM |
|
Blencowe |
85.50 |
86.29 |
86.36 |
85.99 |
86.66 |
85.09 |
84.26 |
83.59 |
84.45 |
mAh/g NAM |
**ENDS**
For further information please contact:
|
Blencowe Resources Plc Sam Quinn |
www.blencoweresourcesplc.com Tel: +44 (0)1624 681 250
|
|
Investor Relations Sasha Sethi |
Tel: +44 (0) 7891 677 441 |
|
Tavira Securities Jonathan Evans |
Tel: +44 (0)20 3192 1733
|
Twitter https://twitter.com/BlencoweRes
LinkedIn https://www.linkedin.com/company/72382491/admin/
Background
Orom-Cross Graphite Project
Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit.
A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is now completing the Definitive Feasibility Study phase as it drives towards first production.
Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.
Apollo Energy Systems Inc.
Apollo is a company with 60-years of experience in development of Batteries, Fuel Cells and Systems which incorporate those products. Their roots go back to 1953 when they built their first battery plant in Puerto Rico.
The company is developing “Lead Cobalt Battery” and “Alkaline Fuel Cell” to provide a Propulsion system for an electric vehicle which will enable that car to drive continuously, like a gasoline powered car, without external recharging (not necessary to “plug-in” to an outside receptacle); and will provide a Power Plant System to give electricity to a home, farm, hotel, cell towers or commercial establishment without use of the outside grid supplied by electric utility companies.
#KAV Kavango Resources PLC – Investment in Pambili Natural Resources TSX-V:PNN
Kavango Resources plc (LSE:KAV), the Southern Africa-focused metals exploration company, is pleased to announce that the Company has completed a strategic investment in gold mining, exploration, and development company Pambili Natural Resources Corporation (“Pambili” or “the Corporation”) (TSX-V:PNN).
Kavango has given notice to Pambili that it wishes to convert a US$250,000 convertible loan (the “Loan”) made to Pambili, along with a Loan Premium of US$75,000 (“Repayment amount”), into common shares in the Corporation (“the Conversion”). Following the Conversion, Kavango will hold 15% of Pambili’s total issued share capital.
Pambili is active in Matabeleland in southern Zimbabwe, having established operations here in 2022.
Kavango has worked with Pambili since March this year, assisting it through a corporate restructure and acquisition of the Golden Valley project, which completed earlier in November 2023 (Pambili’s announcement can be read >>> here).
Golden Valley has a history of high-grade underground mining and gold production. Golden Valley includes a functional gold processing plant and stamp mill, two historic shafts that present prospective exploration targets and near surface exploration potential to target a possible larger-scale deposit. Some small-scale gold production continues at Golden Valley by way of toll-milling third-party ore through an on-site stamp mill.
Pambili’s plan at Golden Valley is to explore the underground potential first, with a view to recommencing mining in Q1 2024. The processing plant is ready to receive ore and plans are being finalised for underground exploration drilling.
In parallel to this, Pambili will conduct surface exploration at Golden Valley using Kavango’s field team.
By taking a strategic interest in Pambili, Kavango is seeking to build on its first-mover advantage in Matabeleland by increasing its exposure to a third, highly prospective greenstone belt. Golden Valley is located on a separate greenstone belt to the one that hosts Kavango’s Hillside and Nara projects and a separate greenstone belt to the one that hosts the Leopard Project (announced >>> 25 July 2023).
In addition, Kavango and Pambili will be able to share operational, exploration and administrative functions. This is expected to provide both companies with significant cost savings and operational efficiencies.
Ben Turney, Chief Executive of Kavango Resources, commented:
“There is immense opportunity in Zimbabwe’s Matabeleland goldfields. Kavango has identified a strong pipeline of opportunities across the region. Our investment in Pambili creates for us an additional outlet for some of these.
We are very pleased to partner with Pambili, as Jon Harris and his team recommence mining at Golden Valley. This is an exciting project that Kavango knows well. It combines excellent potential for near-term revenue generation with untested surface exploration upside.
The greenstone belt that Golden Valley is on is highly prospective for gold with a number of possibilities for further expansion in the area. The processing plant is operational and can be added to as Pambili grows. With what we’ve learned about historic cut-off grades at Golden Valley, underground drilling could deliver a very positive result.
We have been able to secure our investment in Pambili at a low entry point. I expect our ongoing working relationship, supported by the shared operational efficiencies it affords, has already added, and will continue to add, substantially to our balance sheet over time.“
Further information in respect of Kavango and its business interests is provided on the Company’s website at www.kavangoresources.com and on Twitter at #KAV.
For further information please contact:
Kavango Resources plc
Ben Turney
+46 7697 406 06
First Equity (Broker)
Jason Robertson
+44 207 374 2212
Kavango Competent Person Statement
The technical information contained in this announcement pertaining to geology and exploration have been read and approved by Brett Grist BSc(Hons) FAusIMM (CP). Mr Grist is a Fellow of the Australasian Institute of Mining and Metallurgy with Chartered Professional status. Mr Grist has sufficient experience that is relevant to the exploration programmes and geology of the main styles of mineralisation and deposit types under consideration to act as a Qualified Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.