Home » Posts tagged 'mineral' (Page 3)

Tag Archives: mineral

#GRX GreenX Metals Limited – Quarterly Report March 2025

Quarterly Activities Report March 2025

GreenX Metals Limited (ASX:GRX, LSE:GRX) (GreenX or the Company) is pleased to present its Quarterly Activities Report for the period during and subsequent to 31 March 2025.

HIGHLIGHTS

·    German Project – Tannenberg Copper Project

o In January 2025, GreenX was selected as as one of eight exploration companies to participate in BHP’s 2025 Xplor program.

o BHP Xplor will provide GreenX with US$500,000 in non-dilutive funding to support and accelerate its exploration plans at the Tannenberg Copper Project (Tannenberg) during the 6-month period of the program.

o Tannenberg exploration licence expanded to 1,900km2 from 272km2.

Expanded Tannenberg Project Area

o The Tannenberg area contains historically producing copper mines and multiple historical drill intercepts, with excellent potential for new discoveries of shallow (50 m to 500 m), large scale and high-grade copper and silver mineralisation, with much of the new expanded licence area remaining untested by modern exploration.

o Funding from BHP Xplor is currently being used, in collaboration with BHP, to accelerate the geological concept build-out and exploration timeframe at Tannenberg including the newly expanded license area.

·    Greenland Projects

o The Company notes the recent U.S. strategic interest in Greenland including Greenland Prime Minister publicly stating that he is open to discussions with the U.S.

o Greenland is endowed with an abundance of critical minerals which are essential for batteries, technology and defence.

o The Company is well placed to capitalise on the increased interest in Greenland with two large scale, strategic projects prospective for critical minerals located in Greenland.

Eleonore North Project

o outstanding antimony results previously at the Eleonore North project in Greenland (Eleonore North or ELN).

o Antimony price now at US$60,000/t from historical prices of ~US$5,000.

o Critical mineral crisis escalating – China has now restricted export of critical and strategic antimony, graphite, gallium, germanium, tungsten, titanium and rare earths.

o Antimony and tungsten have been designated as “Critical Minerals” by the U.S. and the EU, with NATO designating tungsten as defence-critical for the Allied defence industry.

o Historical results from fieldwork at ELN include grab samples from outcropping mineralised veins with individual specimens grading up to 23% antimony (Sb), and other samples up to 4g/t gold (Au).

o Antimony mineralisation has been identified along a ~4km trend in veins and structures, that broadly aligns with previously identified gold veining at surface within a 15km trend.

Arctic Rift Copper Project

o The Company is targeting large scale copper in multiple settings across a 5,774 km2 licence at the Arctic Rift Copper Project (ARC).

o Further analysis on remote-sensing options underway which aims to improve understanding of the known copper mineralisation and to plan the next exploration program at the project.

·    Arbitration Award

o In October 2024, GreenX was awarded up to £252 million (A$525 million/PLN 1.3 billion) in compensation from the successful outcome of the international arbitration claims (Claim) against the Republic of Poland (Poland or Respondent) under both the Australia-Poland Bilateral Investment Treaty (BIT) and the Energy Charter Treaty (ECT).

o Interest income of ~£14 million (A$29 million / PLN 70 million) per annum is currently accruing to GreenX. Against this, interest expense of ~£2.7 million (A$5.6 million / PLN 13.4 million) per annum is accruing on the US$11.3 million of litigation funding utilised.

o Upon satisfaction of the award, it is GreenX’s intention to return the majority of the available cash to shareholders.

o Since the award was made, Poland has lodged a request to set-aside the award with the courts of England and Wales in relation to the BIT award and the courts of Singapore in relation to the ECT Award. Poland is challenging jurisdictional aspects of both awards and alleging procedural unfairness, including in the Tribunal’s decision on damages.

o The Company is strongly defending the set-aside motions.

Classification: 2.2 This announcement contains inside information

ENQUIRIES

 

Ben Stoikovich
Chief Executive Officer

+44 207 478 3900

 

 

Link here to view the full announcement and financial statements.

#URU URU Metals Limited – Mining Right: Key Regulatory Milestone Met

URU Metals Limited (“URU” or the “Company”) is pleased to announce that, Lesego Platinum Uitloop (Pty) Ltd (“LPU”), has initiated a share issuance process to comply with South Africa’s empowerment regulations under Mining Charter III. This significant step marks a crucial milestone in fulfilling the requirements for the granting of the mining right by the Department of Mineral Resources and Energy (DMRE) to URU, thereby positioning the Company to advance its exploration and further project development activities.

In alignment with Mining Charter III’s provisions for meaningful participation of Historically Disadvantaged South Africans (HDSA), LPU will allocate 10% of its equity as follows:

·    5% to an Employee Share Ownership Scheme (ESOP): This initiative ensures that the employees of LPU directly benefit from the company’s growth and success, fostering long-term engagement and inclusivity.

·    5% to a newly formed Non-Profit Company (NPC), Uitloop Communities NPC. The NPC will focus on community development and socio-economic upliftment, furthering the mandate to deliver tangible benefits to local stakeholders.

These measures, previously disclosed by the Company, reflect the Company’s commitment to operating in compliance with South African mining legislation and fostering sustainable relationships with employees and surrounding communities.

Clearing the Path for Exploration Progress

The share issuance marks a key regulatory milestone, significantly advancing the process for the Company to secure its mining right. Once granted, the mining right will enable the Company to proceed with the next phase of the exploration program, including:

·    Infill Drilling Program: A focused campaign aimed at upgrading the existing resource classification at the Zebediela project.

·    Declaration of a Maiden Resource: This phase will target the high-grade nickel-platinum group elements (Ni-PGE) mineralization in the footwall zone, building upon the substantial resource base already identified.

These advancements underline URU’s commitment to maximizing the value of its projects while adhering to regulatory and community-focused best practices.

A Milestone for Sustainable Growth

“We are thrilled to take this significant step towards regulatory compliance and operational progress,” said John Zorbas, CEO of URU.

“The issuance of shares by LPU not only demonstrates our commitment to supporting the principles of Mining Charter III but also solidifies our path toward securing the mining right. This milestone positions us to unlock the immense potential of our project while delivering value to all stakeholders, including our employees and local communities.”

Looking Ahead

As LPU progresses towards mining right issuance and exploration advancements, URU remains focused on operational excellence and stakeholder engagement. The Company looks forward to updating the market on its exploration milestones, including the anticipated maiden resource declaration, in due course.

URU is a mineral exploration and development company focused on advancing its high-potential critical metals projects in South Africa. The Company is committed to creating sustainable value through responsible mining practices, regulatory compliance, and engagement with stakeholders. For more information, visit www.urumetals.com.

Market Abuse Regulation (MAR) Disclosure

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 (“MAR”), and is disclosed in accordance with the Company’s obligations under Article 17 of MAR. 

 

For further information, please contact:

 

URU Metals Limited

John Zorbas

(Chief Executive Officer)

 

+1 416 504 3978

 

SP Angel Corporate Finance LLP

(Nominated Adviser and Broker)

Ewan Leggat / Jen Clarke

+ 44 (0) 203 470 0470

#ECR Minerals – Collaboration Agreement with James Cook University on Rare Earth Elements at the Lolworth Project

ECR Minerals PLC (AIM: ECR), the gold exploration and development company focused on Australia, is pleased to announce that it has entered into a collaboration agreement with James Cook University (“JCU”) in Queensland, a leading institution in science and engineering research, to further explore the potential for rare earth elements (“REE”) within the Company’s Lolworth Project area in Queensland (the “Lolworth Project”).

 

Following approval of funding for the project by the Trailblazer Steering Committee, the collaboration will see JCU recruit post-doctoral researchers and PhD students to form a dedicated team. This dedicated team will focus on analysing and interpreting the mineral data from the Lolworth Project area to enhance the understanding of its REE potential.

 

Under the terms of the collaboration agreement, all data generated through this collaboration will be shared with ECR, further strengthening the Company’s technical insights into the region. While ECR is pleased to support JCU in this important research initiative, the pace of the Company’s broader technical development across the wider Lolworth Project area will continue to be driven by its own technical team and exploration priorities.

 

James Cook University is a public university in North Queensland, Australia. The second oldest university in Queensland, JCU is a teaching and research institution with its main campuses located in Cairns and Townsville, and one in Singapore.  JCU is ranked in the world’s top 300 universities by the Times Higher Education World University Rankings 2022 and also has study centres in Mount IsaMackay, Thursday Island and Rockhampton.

 

Mike Whitlow, ECR’s Managing Director, said: “We are thrilled to see further validation of our projects in Queensland, in particular the Lolworth Project, through this exciting collaboration with James Cook University. This partnership, which is fully funded by JCU, not only underscores the growing interest in the Lolworth Project region, but also expands our technical understanding of a fast-emerging area of interest. Combined with our existing collaboration with the Geological Survey of Queensland, this initiative places ECR in a stronger position to potentially unlock the Lolworth Project’s REE potential and create significant shareholder value.”

 

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals Plc

Tel: +44 (0) 1738 317 693

Nick Tulloch, Chairman

Andrew Scott, Director

Email:

info@ecrminerals.com

Website: www.ecrminerals.com

Allenby Capital Limited

 

Tel: +44 (0) 3328 5656

Nominated Adviser

Nick Naylor / Alex Brearley / Vivek Bhardwaj

info@allenbycapital.com

 

Axis Capital Markets Limited

Tel: +44 (0) 203 026 0320

Broker

Ben Tadd / Lewis Jones

SI Capital Ltd

Tel: +44 (0) 1483 413500

Broker

Nick Emerson

Brand Communications

Tel: +44 (0) 7976 431608

Public & Investor Relations

Alan Green

 

                                                               

ABOUT ECR MINERALS PLC

 

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has six licence applications outstanding which includes one licence application lodged in eastern Victoria (Tambo gold project).

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three approved exploration permits covering 946 km2 over a relatively unexplored area in Lolworth Range, Queensland, Australia. The Company has also submitted a license application at Kondaparinga which is approximately 120km2 in area and located within the Hodgkinson Gold Province, 80km NW of Mareeba, North Queensland.

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), MGA has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

MGA also has approximately A$75 million of unutilised tax losses incurred during previous operations.

#AYM Anglesey Mining PLC – Submission of Parys Mountain Mine Environmental Impact Assessment Scoping Report

Anglesey Mining plc (AIM:AYM), is pleased to announce that it has reached an important project milestone with the formal submission on 31st July 2024 of the Parys Mountain Mine Environmental Impact Assessment (EIA) Scoping Report to the North Wales Minerals and Waste Planning Service (the “Planning Service”) as part of a formal EIA Scoping Opinion request. The Planning Service assesses mineral planning applications on behalf of the Isle of Anglesey County Council and other County Councils within the North Wales Region.

The Scoping Report forms part of the first stage in the EIA process and comes after almost two years of extensive studies and work by the Anglesey team on site. Cumulative expenditure on the EIA process in that timeframe is almost £300,000. The scoping report sets out the project’s perceived impacts, specifically identifying any crucial and significant impacts which will be assessed as part of the final EIA report, the compilation of which will require further environmental and ecological work. At this EIA scoping stage, the project description remains indicative and will be refined following ongoing mining engineering studies, economic analysis and discussions with neighbours, the wider community and other stakeholders. The mining at Parys will be carried out by underground methods; there are no plans for an open pit or opencast mine extraction works.

The Scoping Opinion request will now be validated by the Planning Service and when that process is completed it will be placed on the Anglesey Council Planning Public Register.  At that time, Anglesey Mining will publish a further RNS release providing information on how interested parties can view and comment on the report.

Anglesey’s C.E.O. Rob Marsden participated in a monitoring visit and meeting on site at Parys Mountain on 13th August 2024 with the Senior Minerals and Waste Planning Officer under the ‘The Town and Country Planning (Fees for Applications and Deemed Applications) (Wales) (Amendments) Regulations 2020, which mineral planning authorities utilise to monitor mineral sites and their extant planning permissions. A brief overview of Anglesey’s new proposal was also discussed at the above meeting.

The Anglesey team are committed to close collaboration with stakeholders, communities, industry and supply chain participants, particularly around minimising potential environmental impacts and maximising economic development opportunities for local communities.

Preservation of existing heritage areas, sites of special scientific interest (SSSI’s) and scheduled historic monuments and buildings have been a major factor in Anglesey determining the location of new proposed surface infrastructure, and similarly, other environmental and social considerations. The EIA Scoping Report considers how measures to avoid, mitigate or compensate would be identified to address the impacts of the project. 

Copper, zinc, silver and lead are essential metals that will be required for, amongst other uses, the transition of the UK’s energy use and distribution towards electricity and away from fossil fuels.  To produce these minerals from the Parys Mountain mine, new surface infrastructure will be required, including a tailings management facility, a decline portal and some small ventilation shaft collars. The proposed approximate locations of such surface features are shown in a drawing and are described in the EIA Scoping report.  The details may change as the Environmental Impact Assessment process proceeds.  Anglesey has decided to submit a fresh planning application, rather than alter the existing one, for several reasons that are outlined in the EIA Scoping Report.  This is partly because additional mineral resources have been identified recently during a campaign of exploration drilling and because Anglesey intends to avoid any potential damage to heritage and biodiversity assets that have been designated since the last mineral permission.  Finally, technological changes since the original planning permission offer more efficient methods of mining, ore processing, pollution control and tailings storage.

Rob Marsden, CEO of Anglesey Mining, commented: “The submission of the Environmental Impact Assessment Scoping Report for the Parys Mountain Project is a very significant milestone for Anglesey. The assessment of the environmental and social impacts of mining of copper, zinc, lead, silver and gold from Parys Mountain, in addition to the economic feasibility, will play a major part in the permitting processes required to progress the project through investment and financing to mineral production.”

“It is worth reminding investors that Parys Mountain is demonstrably the largest and most advanced copper/zinc/lead/silver/gold project in the UK with a substantial resource upside. In addition, the project is favourably located on a previously permitted, development site with significant existing infrastructure already in place.“

About Anglesey Mining plc:

Anglesey Mining is traded on the AIM market of the London Stock Exchange and currently has 461,593,017 ordinary shares in issue.

Anglesey is developing the 100% owned Parys Mountain Cu-Zn-Pb-Ag-Au VMS deposit in North Wales, UK with a reported resource of 5.3 million tonnes at over 4.0% combined base metals in the Measured and Indicated categories and 10.8 million tonnes at over 2.5% combined base metals in the Inferred category.

Anglesey also holds a 49.75% interest in the Grängesberg iron ore project in Sweden and 12% of Labrador Iron Mines Holdings Limited, which through its 52% owned subsidiaries, is engaged in the exploration and development of direct shipping iron ore deposits in Labrador and Quebec. 

For further information, please contact:

Anglesey Mining plc

Rob Marsden, Chief Executive Officer – Tel: +44 (0)7531 475111

Andrew King, Interim-Chairman – Tel: +44 (0)7825 963700

Davy

Nominated Adviser & Joint Corporate Broker

Brian Garrahy / Daragh O’Reilly – Tel: +353 1 679 6363

Zeus Capital Limited

Joint Corporate Broker

Katy Mitchell / Harry Ansell – Tel: +44 (0)161 831 1512

#SVML Sovereign Metals LTD – Increased Graphite Bulk Sample Capacity

Industrial scale spiral concentrator to be installed at Sovereign’s expanded laboratory and testing facility in Lilongwe in coming weeks

·       Spiral throughput capacity of up to 10 tonnes per hour of ore for graphite and rutile sample preparation

·     Installation and commissioning led by Sovereign’s Head of Project Development, Mr Paul Marcos, who previously worked for Base Resources on their Kwale and Toliara projects and for Iluka Resources across various mineral sands operations

·     Final graphite concentrate for bulk sample battery anode testwork and qualification advancing under the supervision of Sovereign’s Chief Technology Officer – Graphite, Dr Surinder Ghag

·     Sovereign is targeting a market-leading position as the world’s largest and lowest-cost producer of rutile for the titanium industry, and flake graphite for the lithium-ion battery market

Sovereign Metals Limited (ASX:SVM; AIM:SVML) (the Company or Sovereign) is pleased to announce that following the appointment of graphite specialist Dr Surinder Ghag as Chief Technology Officer – Graphite, the Company will be increasing graphite pre-concentrate sample preparation from its existing testing facility in Lilongwe, Malawi.

In the coming weeks, Sovereign will install and commission a spiral concentrator containing industrial-scale MG12 spiral equipment at the Company’s laboratory and testing facility in Lilongwe, enabling the preparation of rutile concentrate and graphite circuit feed from its Kasiya Rutile-Graphite Project (Kasiya or Project) at a bulk scale. The graphite circuit feed will be sent to specialised laboratories where flotation, purification, spheronisation and coating testwork for the battery anode segment will take place in line with Sovereign’s strategy to commercialise Kasiya’s graphite by-product.

Managing Director Frank Eagar commented: “The intellectual property that Dr Ghag and Mr Marcos bring to Sovereign has meant that we can expand and expedite our graphite commercialisation strategy significantly. The infrastructure, along with the ability to provide large amounts of graphite concentrate to the lithium-ion battery industry for battery anode product qualification, offers Sovereign a big advantage. With a world-class team in place and alongside our strategic investors, Rio Tinto, Kasiya is moving ahead at a considerable pace.”

The spiral concentrator is currently in its final stages of testing at engineering consultancy Paterson & Cooke’s Cape Town laboratory, after which it will be dispatched to Lilongwe, Malawi. The spiral is identical size and scale to that designed in the Pre-feasibility Study flowsheet for the Kasiya Rutile-Graphite Project and will have a throughput capacity of up to 10 tonnes of ore per hour for sample preparation.

Sovereign’s Head of Project Development, Mr Paul Marcos, has led the spiral installation project. Mr Marcos has 30 years of mineral sands operations, engineering, and consulting expertise. Before joining Sovereign in July 2021, Mr Marcos spent over ten years working on Base Resources Limited (Base) projects both in a design role with Ausenco and then on Base’s owner’s team.

Mr Marcos was involved with the original Kwale Project and then Kwale North and Kwale Phase 2 Projects in Kenya and also the Toliara Project’s Scoping, Pre-Feasibility and Definitive Feasibility Studies in Madagascar. Between 1996 and 2004, Mr Marcos worked at major mineral sands producer Iluka Resources Limited in a number of production, mineral processing and project development roles.

Sovereign’s newly appointed graphite specialist Chief Technology Officer – Graphite, Dr Surinder Ghag, will be responsible for graphite testwork programs and product qualification. A highly qualified metallurgist, Surinder brings over 25 years of industry experience, including developing graphite test work programs, ore-to-anode graphite strategies, anode plant feasibility studies, and project development and commissioning.

A group of people standing next to a machine Description automatically generated

Figure 1: Final stages of assembling the spiral plant at Paterson & Cooke, South Africa

 

Classification 2.2: This announcement includes Inside Information

ENQUIRIES

Frank Eagar (South Africa/Malawi)
Managing Director

+61(8) 9322 6322

Sam Cordin (Perth)
+61(8) 9322 6322

Sapan Ghai (London)
+44 207 478 3900

 

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

 

 

Joint Brokers

 

Stifel

+44 20 7710 7600

Varun Talwar

 

Ashton Clanfield

 

 

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Buchanan

+ 44 20 7466 5000

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 (‘MAR’). Upon the publication of this announcement via Regulatory Information Service (‘RIS’), this inside information is now considered to be in the public domain.

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as “expects”, “anticipates”, “believes”, “projects”, “plans”, and similar expressions. These forward-looking statements are based on Sovereign’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

 

#SVML Sovereign Metals LTD – Follow-Up Drilling Initiated North of Kasiya

FOLLOW-UP DRILLING INITIATED NORTH OF KASIYA RESOURCE AREA

·      Wide-spaced regional follow-up drilling for the Kasiya Project underway focusing on the region to the north of the current resource footprint, with results from the drill program expected in the coming weeks

·      Recently reported reconnaissance drilling to the south identified an 8km extension of mineralisation which remains open along strike and at depth

·      Kasiya is already the largest natural rutile deposit and second-largest flake graphite deposit in the world

·      Kasiya’s current MRE of 1.8 Billion tonnes at 1.0% rutile and 1.4% graphite comprises broad and contiguous zones of high-grade rutile and graphite that occur across an area of over 201km2

·      Optimisation program for the Kasiya Project continues in conjunction with our strategic investor, Rio Tinto

 

Sovereign Metals Limited (ASX:SVM; AIM:SVML) (the Company or Sovereign) is pleased to report that the Company has initiated a follow-up 400 metre spaced drill program at its tier one Kasiya Rutile-Graphite Project (Kasiya) in Malawi. The program will focus on determining the boundaries and extent of mineralisation north of the known Mineral Resource Estimate (MRE) area.

The 70+ hole hand-auger drill program has been designed to target areas where mineralisation was identified in earlier wide-spaced regional hand-auger drilling. The target area is up to 20km north of the current MRE boundary. Drilling is currently underway and will be completed in the coming weeks. Four hand-auger teams have been deployed under the supervision of Sovereign’s in-country technical team.

Samples will be initially processed in the Company’s Lilongwe own lab facility and then shipped for final analysis at certified international laboratories. Results from the drill program are expected in the coming weeks.

SOUTHERN EXTENSION

In February 2024, the Company announced regional hand-auger drilling south of the Kasiya MRE footprint had identified significant strike extensions of approximately 8km across a number of parallel mineralised zones ranging from 400m to 2km in width.

All newly defined mineralisation in the south remains open at depth due to the limitations of the hand-auger drilling method but are expected to continue to the saprock boundary normally between 20 and 30 vertical metres from surface. The multiple mineralised zones identified remain open along strike both to the north and south.

These results indicate the potential to expand the already significant, high-grade rutile and graphite MRE at Kasiya.

A map with a map and a pointer Description automatically generated with medium confidence

Figure 1: Southern mineralised extensions at Kasiya

 

ENQUIRIES

Frank Eagar (South Africa/Malawi)
Managing Director

+61(8) 9322 6322

Sam Cordin (Perth)
+61(8) 9322 6322

Sapan Ghai (London)
+44 207 478 3900

 

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

Harry Davies-Ball

 

 

Joint Brokers

 

Stifel

+44 20 7710 7600

Varun Talwar

 

Ashton Clanfield

 

 

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Buchanan

+ 44 20 7466 5000

 

Competent Person Statement

The information in this announcement that relates to the Exploration Results is extracted from the announcement dated 1 February 2024 entitled ‘Extensions to Rutile & Graphite Mineralisation at Kasiya’. which is available to view at www.sovereignmetals.com.au. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this announcement have not been materially changed from the original announcement.

The information in this announcement that relates to the Mineral Resource Estimate is extracted from an announcement dated 5 April 2023 entitled ‘Kasiya Indicated Resource Increased by over 80%’ which is available to view at www.sovereignmetals.com.au and is based on, and fairly represents information compiled by Mr Richard Stockwell, a Competent Person, who is a fellow of the Australian Institute of Geoscientists (AIG). Mr Stockwell is a principal of Placer Consulting Pty Ltd, an independent consulting company. The original announcement is available to view on www.sovereignmetals.com.au. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this announcement have not been materially changed from the original announcement.

The information in this announcement that relates to Production Targets, Ore Reserves, Processing, Infrastructure and Capital Operating Costs, Metallurgy (rutile and graphite) is extracted from an announcement dated 28 September 2023 entitled ‘Kasiya Pre-Feasibility Study Results’ which is available to view at www.sovereignmetals.com.au and is based on, and fairly represents information compiled by . Sovereign confirms that: a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions and technical parameters underpinning the Production Target, and related forecast financial information derived from the Production Target included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this presentation have not been materially modified from the original announcement.

Ore Reserve for the Kasiya Deposit

 

Classification

Tonnes
(Mt)

Rutile Grade
(%)

Contained Rutile
(Mt)

Graphite Grade (TGC) (%)

Contained Graphite
(Mt)

RutEq. Grade*
(%)

Proved

Probable

 538

1.03%

5.5

1.66%

8.9

2.00%

Total

 538

1.03%

5.5

1.66%

8.9

2.00%

* RutEq. Formula: Rutile Grade x Recovery (100%) x Rutile Price (US$1,484/t) + Graphite Grade x Recovery (67.5%) x Graphite Price (US$1,290/t) / Rutile Price (US$1,484/t). All assumptions are taken from the PFS ** Any minor summation inconsistencies are due to rounding

Kasiya Total Indicated + Inferred Mineral Resource Estimate at 0.7% rutile cut-off grade

Classification

Resource
(Mt)

Rutile Grade
(%)

Contained Rutile
(Mt)

Graphite Grade (TGC) (%)

Contained Graphite
(Mt)

Indicated

 1,200

1.0%

12.2

1.5%

18.0

Inferred

 609

0.9%

5.7

1.1%

6.5

Total

 1,809

1.0%

17.9

1.4%

24.4

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as “expects”, “anticipates”, “believes”, “projects”, “plans”, and similar expressions. These forward-looking statements are based on Sovereign’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

 

 

#SVML Sovereign Metals LTD – December 2023 Quarterly Report

Project Optimisation

·        During the quarter, Sovereign advanced optimisation test work and technical studies for the Kasiya rutile-graphite project (Kasiya or the Project) with the Company’s strategic investor, Rio Tinto

·        Significant field activities and a number of test work programs have commenced in order to provide data for the Project optimisation phase

·        The Company aims to become the world’s largest, lowest cost and lowest-emissions producer of two critical minerals – titanium (rutile) and graphite

Key Management Appointments to Drive Project Optimisation and Development at Kasiya

·        Appointment of experienced Africa-based mining executive, Mr Frank Eagar, as the new Managing Director and CEO

·        Previous Managing Director Dr Julian Stephens has transitioned to Non-Executive Director

·        Key technical appointments of experienced African engineering, social and environmental teams to work on advancing the Kasiya project

Lithium-Ion battery graphite program upscaled

·        Over 60 tonnes of ore was extracted targeting production of an initial 600kg of natural graphite for lithium-ion battery anode test work and product qualification

·        The upscaled graphite qualification program will support ongoing Project studies

·        Sovereign and Rio Tinto have agreed to collaborate to qualify graphite from Kasiya, with a particular focus on supplying the spherical purified graphite (SPG) segment of the lithium-ion battery anode market

·        This graphite qualification program coincides with China’s announced curbs on exports of natural graphite, a critical mineral for the US, EU, Japan and Australia

Highly-experienced social specialist appointed

·        Africa-based social specialist consultancy, SocialEssence were appointed to lead social and community development programs for Sovereign in Malawi

·        SocialEssence joins Sovereign’s Owners Team and will design, implement, and manage several social and community initiatives which will feed into Project studies and permitting

·        SocialEssence has a strong and successful track record of implementing social responsibility programs across southern Africa, including at First Quantum Minerals’ Zambian project

 

Classification 2.2: This announcement includes Inside Information

ENQUIRIES

Mr Frank Eagar (South Africa/Malawi)
Managing Director and CEO

+27 76 753 5377

Sam Cordin (Perth)
+61 (0)422 799 087

Sapan Ghai (London)
+44 207 478 3900

 

 

Nominated Adviser on AIM and Joint Broker

SP Angel Corporate Finance LLP

Joint Brokers

Berenberg

Buchanan

+44 20 7466 5000

 

KASIYA PROJECT OPTIMISATION

The Pre-Feasibility Study (PFS) confirmed Kasiya as a potential major critical minerals project with an extremely low CO2-footprint delivering substantial volumes of natural rutile and graphite to global markets while generating significant economic returns.  

At the completion of the PFS, the Company commenced an optimisation study phase prior to advancing to the Definitive Feasibility Study (DFS). During the quarter, significant field activities and test work commenced.

The optimisation phase will be conducted in collaboration with the Company’s strategic partner, Rio Tinto, following their investment into the Company in July 2023.

KEY MANAGEMENT APPOINTMENTS TO DRIVE PROJECT OPTIMISATION

Effective from 20 October 2023, the Company appointed Mr Frank Eagar as Managing Director and Chief Executive Officer (CEO). Dr Julian Stephens, transitioned to a Non-Executive Director of Sovereign, remaining as a consultant assisting and supporting the incoming technical and management team.

Mr Eagar has over 20 years’ experience in the financing, permitting, development and operation of mining projects with a strong focus in southern Africa.

Mr Eagar is a Chartered Accountant who has gained extensive corporate, commercial and technical experience in the mining sector throughout his career. Mr Eagar has previously held a number of senior executive positions in the resources sector, more recently with African mining focused private equity firm AMED Funds, which included acting as Chief Financial Officer (CFO) for AMED’s controlled company, Central Copper Resources PLC (Central Copper).

Prior to Central Copper, Mr Eagar was the CEO (and prior to that the CFO) of Baobab Steel Limited (Baobab) another AMED controlled company, where he managed the completion of a DFS and a joint venture with the World Bank’s IFC to procure strategic investors and raise project finance for Baobab’s US$1 Billion, fully permitted, integrated 500ktpa Steel and Vanadium Project in Mozambique.

Mr Eagar joined Sovereign in December 2022 as General Manager in Malawi, where he has already expanded the team with a focus on Malawian nationals, developed strong relationships with Government and developed a clear understanding of the Kasiya Project and its development landscape.

Sovereign has also made several key technical appointments as the Company transitions into project optimisation and development of the Kasiya Project and is poised to become a significant supplier of natural rutile and graphite. These key appointments bring a strong track record of successful large-scale project development and operations management, as well as extensive experience in southern Africa.

These management changes come at an important time for the Company as it transitions from the PFS into the next study phases including optimisation, community and stakeholder engagements and project permitting.

LITHIUM-ION BATTERY GRAPHITE PROGRAM UPSCALED

During the quarter, Sovereign completed the extraction of a 60 tonne bulk sample of ore from Kasiya to produce an initial 600kg of natural flake graphite. This sampling program is part of the Company’s graphite qualification, product development and downstream battery anode test work phase. A major component to graphite sales agreements is customer qualification with graphite produced from this program to be shared with prospective end-users in addition to being used for upscaled downstream test work.

The mechanised drill program used a bespoke 300mm diameter spiral auger to extract the material from across Kasiya’s planned future pits with sampling to a maximum 20m depth.

A group of men wearing hard hats and blue overalls Description automatically generated

Figures 1 & 2: Bulk sample mechanised spiral drilling and sampling at Kasiya in November 2023

The bulk sample is undergoing pre-processing at the Company’s laboratory in Lilongwe, Malawi. The sample is being processed utilising the newly installed Kwatani 30-inch single and double-deck vibrating separators for sizing and de-sliming (Figure 3). The sand fraction is then processed over the new Holman Wilfley 2000 wet shaking table to produce a graphite pre-concentrate and a separate heavy mineral concentrate (HMC) containing the rutile (Figure 4). The graphite pre-concentrate is expected to grade 4-5% Ct.

A group of people in blue uniforms Description automatically generated A circular object with a round surface Description automatically generated with medium confidence

Figure 3. Installation of the new Kwatani 30-inch single-deck and double-deck vibrating separators for sizing and de-sliming bulk samples at the Company’s Malawi laboratory and metallurgical facility

Figure 4: Holman-Wilfley 2000 Series shaking table operating at Sovereign’s Lilongwe laboratory in Malawi.

 

Final processing will then be completed at international commercial laboratories. The graphite pre-concentrate will undergo traditional flotation and polishing processes to target >96% Ct product suitable as a lithium-ion battery anode feedstock.

Downstream Test work

The initial ~600kg of flake graphite product produced will be used for downstream test-work and product qualification targeting the battery anode sector. Previously reported initial characterisation test work on Kasiya’s graphite has indicated excellent suitability for use in lithium-ion batteries with very high purity and very high crystallinity being the key features (refer to ASX Announcement dated 8 June 2023).

Downstream test-work and qualification on the flake graphite product will involve the following stages to be completed at recognised international battery sector laboratories;

–    Purification to >99.95% Ct

–    Micronisation

–    Spheronisation

–    Carbon coating

–    Anode production

–    Electrochemical characterisation

Raw flake graphite products plus final CSPG (coated spheronised graphite product) will be provided to potential offtakers for assessment and pre-qualification. Through Sovereign’s long-term experience in graphite, the Company has built a strong understanding of the graphite market and developed well-established relationships with offtakers and customers.

A close-up of a microscope Description automatically generated

Figures 5 & 6: SEM micrograph of Kasiya graphite flotation concentrate from previous test work

Industry Developments

The upscaled graphite program comes as China implements curbs on exports of natural graphite under “national security” concerns. Effective 1 December 2023, China requires export permits for some graphite products including natural graphite and natural graphite products critical to EV production. China is the world’s top graphite producer and exporter and also refines more than 90% of the world’s graphite into the material that is used in virtually all EV battery anodes.

China’s commerce ministry said the move on graphite was “conducive to ensuring the security and stability of the global supply chain and industrial chain, and conducive to better safeguarding national security and interests”.

Since the restrictions, total exports of flake graphite dropped by 94% on a monthly basis in December, while exports of spherical graphite slumped by 92% (China customs data). Exports to major destinations also slowed notably in December. Flake graphite volumes to Japan fell from 6,138 tonnes in November to zero in December, while exports to the United States fell from 511 tonnes in November to zero in December (Fastmarkets). It was reported by Japan News, that, Japan, which depends on China for 90% of its graphite imports, likely needs to urgently diversify its procurement sources.

Kasiya is one of the world’s largest natural flake graphite deposits and has the potential to become a key source of long term strategic supply to the US, UK, EU, Japan and South Korea.

HIGHLY-EXPERIENCED SOCIAL SPECIALIST APPOINTED

Subsequent to the quarter, Sovereign appointed SocialEssence (Pty) Ltd (SocialEssence), an Africa-based specialist social performance consultancy, who will assist in the continued development of the Company’s stakeholder relations, social performance objectives and its Community and Social Responsibility (CSR) framework. 

Sovereign has engaged SocialEssence to design and execute social performance activities during the DFS phase. Founder, Mr Garth Lappeman, has over 16 years of on the ground social performance planning and implementation experience in accordance with IFC Performance Standards and World Bank Environmental, Health and Safety Guidelines. SocialEssence has been active in a number of countries working on projects in Angola, Botswana, Democratic Republic of Congo, Kenya, Kyrgyzstan, Liberia, Malawi, Mozambique, Namibia, Panama, Uganda, Sierra Leone, South Africa, Northern Sudan, Tanzania, Uzbekistan, and Zambia.

Most notably, in Zambia, SocialEssence’s Director was involved from early exploration through to steady state production of First Quantum Minerals Ltd’s (First Quantum Minerals) Trident operations, which includes the Sentinel Copper Mine which is of similar scale to Sovereign’s Kasiya project. Mr Lappeman was responsible for implementing and managing social and community initiatives for First Quantum Minerals as it established its large-scale commercial operations

SocialEssence will:

·      prepare Kasiya’s Social Impact Assessment and Management Plan for the DFS and permitting;

·      design, implement and manage social performance activities including stakeholder engagement, development of key relationships;

·      prove the feasibility of critical social performance measures (including early local content, and piloting of livelihood restoration programs, and piloting of rehabilitation activities to restore land for agricultural use); and

·      align with the Company’s ESG Framework.

NEXT STEPS

Sovereign is currently conducting an optimisation study prior to advancing to the DFS. The Company aims to become the world’s largest, lowest cost and lowest-emissions producer of two critical minerals – titanium (rutile) and graphite. The Company plans to update the market on the progress of the following in coming months:

·     Further appointments to owner’s team to build on the Company’s execution capabilities;

·     Results of graphite product development, downstream and qualification test work;

·     Regional hand-auger drilling on mineralisation extensions;

·     Progress on the optimisation work streams alongside Rio Tinto via the project Technical Committee; and

·     Community and social engagements across Malawi and the Kasiya area.

Competent Person Statement

The information in this announcement that relates to the Mineral Resource Estimate is extracted from an announcement dated 5 April 2023 entitled ‘Kasiya Indicated Resource Increased by over 80%’ which is available to view at www.sovereignmetals.com.au and is based on, and fairly represents information compiled by Mr Richard Stockwell, a Competent Person, who is a fellow of the Australian Institute of Geoscientists (AIG). Mr Stockwell is a principal of Placer Consulting Pty Ltd, an independent consulting company. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this announcement have not been materially changed from the original announcement.

The information in this announcement that relates to Production Targets, Ore Reserves, Processing, Infrastructure and Capital Operating Costs, Metallurgy (rutile and graphite) is extracted from an announcement dated 28 September 2023 entitled ‘Kasiya Pre-Feasibility Study Results’ which is available to view at www.sovereignmetals.com.au. Sovereign confirms that: a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions and technical parameters underpinning the Production Target, and related forecast financial information derived from the Production Target included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons’ findings are presented in this presentation have not been materially modified from the Announcement.

Ore Reserve for the Kasiya Deposit

 

Classification

Tonnes
(Mt)

Rutile Grade
(%)

Contained Rutile
(Mt)

Graphite Grade (TGC) (%)

Contained Graphite
(Mt)

RutEq. Grade*
(%)

Proved

Probable

 538

1.03%

5.5

1.66%

8.9

2.00%

Total

 538

1.03%

5.5

1.66%

8.9

2.00%

* RutEq. Formula: Rutile Grade x Recovery (100%) x Rutile Price (US$1,484/t) + Graphite Grade x Recovery (67.5%) x Graphite Price (US$1,290/t) / Rutile Price (US$1,484/t). All assumptions are from the Kasiya PFS ** Any minor summation inconsistencies are due to rounding

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 (‘MAR’). Upon the publication of this announcement via Regulatory Information Service (‘RIS’), this inside information is now considered to be in the public domain.

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as “expects”, “anticipates”, “believes”, “projects”, “plans”, and similar expressions. These forward-looking statements are based on Sovereign’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

APPENDIX 1: RELATED PARTY PAYMENTS

During the quarter ended 31 December 2023, the Company made payments of $461,000 to related parties and their associates. These payments relate to existing remuneration arrangements (executive salaries, director fees, superannuation and bonuses ($273,000)), business development services ($35,000) and provision of serviced office facilities, company secretarial services and administration services ($153,000).

APPENDIX 2: SUMMARY OF MINING TENEMENTS

As at 31 December 2023, the Company had an interest in the following tenements:

Licence

Holding Entity

Interest

Type

Licence Renewal Date

Expiry Term Date1

Licence Area (km2)

Status

EL0609

MML

100%

Exploration

25/09/2024

25/09/2028

440.5

Granted

EL0582

SSL

100%

Exploration

15/09/20232

15/09/2027

285.0

Granted

EL0492

SSL

100%

Exploration

29/01/2025

29/01/2025

935.4

Granted

EL0528

SSL

100%

Exploration

27/11/2023

27/11/2025

16.2

Granted

EL0545

SSL

100%

Exploration

12/05/2024

12/05/2026

53.2

Granted

EL0561

SSL

100%

Exploration

15/09/20232

15/09/2027

124.0

Granted

EL0657

SSL

100%

Exploration

3/10/2025

3/10/2029

2.3

Granted

Notes:

SSL: Sovereign Services Limited, MML &McCourt Mining Limited

1  An exploration licence (EL) covering a preliminary period in accordance with the Malawi Mines and Minerals Act (No 8. Of 2019) (Mines Act) is granted for a period not exceeding three (3) years. Thereafter two successive periods of renewal may be granted, but each must not exceed two (2) years. This means that an EL has a potential life span of seven (7) years. ELs that have come to the end of their term can be converted by the EL holder into a retention licence (RL) for a term of up to 5 years subject to meeting certain criteria.

2  The Company submitted an extension application for EL0582 and EL0561 prior to the renewal date in accordance with the Mines Act .

APPENDIX 3: MINING EXPLORATION EXPENDITURES

During the quarter, the Company made the following payments in relation to mining exploration activities:

Activity

A$’000

 Drilling

(291)

 Assaying and Metallurgical Test-work

(162)

 Studies, Reserve/Resource Estimation, Programs

(986)

 Malawi Operations – Site Office, Personnel, Field Supplies, Equipment, Vehicles and Travel

(984)

 Total as reported in Appendix 5B

(2,423)

There were no mining or production activities and expenses incurred during the quarter ended 31 December 2023.

 

Appendix 5B

Mining exploration entity or oil and gas exploration entity
quarterly cash flow report

Name of entity

Sovereign Metals Limited

ABN

Quarter ended (“current quarter”)

71 120 833 427

31 December 2023

 

Consolidated statement of cash flows

Current quarter
$A’000

Year to date
(6 months)
$A’000

1.

Cash flows from operating activities

1.1

Receipts from customers

1.2

Payments for

(2,423)

(4,296)

(a)   exploration & evaluation

(b)   development

(c)   production

(d)   staff costs

(780)

(1,107)

(e)   administration and corporate costs

(414)

(928)

1.3

Dividends received (see note 3)

1.4

Interest received

673

745

1.5

Interest and other costs of finance paid

1.6

Income taxes paid

1.7

Government grants and tax incentives

1.8.1

Other – Demerger Costs

(41)

(67)

1.8

Other – Business Development

(325)

(595)

1.9

Net cash from / (used in) operating activities

(3,310)

(6,248)

2.

Cash flows from investing activities

2.1

Payments to acquire or for:

(a)   entities

(b)   tenements

(c)   property, plant and equipment

(243)

(243)

(d)   exploration & evaluation

(e)   investments

(f)    other non-current assets

2.2

Proceeds from the disposal of:

(a)   entities

(b)   tenements

(c)   property, plant and equipment

(d)   investments

(e)   other non-current assets

2.3

Cash flows from loans to other entities

34

2.4

Dividends received (see note 3)

2.5

Other (provide details if material)

2.6

Net cash from / (used in) investing activities

(243)

(209)

3.

Cash flows from financing activities

40,598

3.1

Proceeds from issues of equity securities (excluding convertible debt securities)

3.2

Proceeds from issue of convertible debt securities

3.3

Proceeds from exercise of options

3.4

Transaction costs related to issues of equity securities or convertible debt securities

(13)

(252)

3.5

Proceeds from borrowings

3.6

Repayment of borrowings

3.7

Transaction costs related to loans and borrowings

3.8

Dividends paid

3.9

Other (provide details if material)

3.10

Net cash from / (used in) financing activities

(13)

40,346

4.

Net increase / (decrease) in cash and cash equivalents for the period

4.1

Cash and cash equivalents at beginning of period

43,021

5,564

4.2

Net cash from / (used in) operating activities (item 1.9 above)

(3,310)

(6,248)

4.3

Net cash from / (used in) investing activities (item 2.6 above)

(243)

(209)

4.4

Net cash from / (used in) financing activities (item 3.10 above)

(13)

40,346

4.5

Effect of movement in exchange rates on cash held

(18)

(16)

4.6

Cash and cash equivalents at end of period

39,437

39,437

 

5.

Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts

Current quarter
$A’000

Previous quarter
$A’000

5.1

Bank balances

129

189

5.2

Call deposits

39,308

42,832

5.3

Bank overdrafts

5.4

Other (provide details)

5.5

Cash and cash equivalents at end of quarter (should equal item 4.6 above)

39,437

43,021

 

6.

Payments to related parties of the entity and their associates

Current quarter
$A’000

6.1

Aggregate amount of payments to related parties and their associates included in item 1

461

6.2

Aggregate amount of payments to related parties and their associates included in item 2

Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments.

 

7.

Financing facilities
Note: the term “facility’ includes all forms of financing arrangements available to the entity.

Add notes as necessary for an understanding of the sources of finance available to the entity.

Total facility amount at quarter end
$A’000

Amount drawn at quarter end
$A’000

7.1

Loan facilities

7.2

Credit standby arrangements

7.3

Other (please specify)

7.4

Total financing facilities

 

7.5

Unused financing facilities available at quarter end

7.6

Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well.

 

 

 

 

8.

Estimated cash available for future operating activities

$A’000

8.1

Net cash from / (used in) operating activities (item 1.9)

(3,310)

8.2

(Payments for exploration & evaluation classified as investing activities) (item 2.1(d))

8.3

Total relevant outgoings (item 8.1 + item 8.2)

(3,310)

8.4

Cash and cash equivalents at quarter end (item 4.6)

39,437

8.5

Unused finance facilities available at quarter end (item 7.5)

8.6

Total available funding (item 8.4 + item 8.5)

39,437

8.7

Estimated quarters of funding available (item 8.6 divided by item 8.3)

12

Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.

8.8

If item 8.7 is less than 2 quarters, please provide answers to the following questions:

8.8.1     Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not?

Answer: Not applicable

8.8.2     Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful?

Answer: Not applicable

8.8.3     Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis?

Answer: Not applicable

Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

 

Compliance statement

1        This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

2        This statement gives a true and fair view of the matters disclosed.

 

 

Date:                31 January 2024

 

Authorised by:  Company Secretary

(Name of body or officer authorising release – see note 4)

 

Notes

1.          This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

2.          If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

3.          Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

4.          If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.

5.          If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

 

 

#GMET Golden Metal Resources PLC – First Day of Dealings

Golden Metal Resources plc, a mineral exploration company focused on tungsten, gold, copper, silver and zinc within Nevada, USA, is pleased to announce that, at 08:00 today, its ordinary shares will commence trading on AIM under the ticker GMET. As part of the process of admission to trading on AIM (“Admission”), the Company has raised gross proceeds of £1.98m through the issue of 23,317,643 new ordinary shares of £0.01 each at a placing price of 8.5 pence per share, equating to a market capitalisation of £7.16 million on Admission.

Overview

The key strengths and attributes of Golden Metal can be summarised as follows:

Location:

The state of Nevada is a well-regarded, mining investment friendly jurisdiction. It was ranked third in the Fraser Institute’s global mining investment attractiveness index survey in 2021 and has a long history of mining and a strong mining and ancillary business support network. Nevada is one of the principal producers of precious metals in the world, with 25 precious metal mines currently in production, accounting for approximately 70 per cent. of the United States total gold production in 2020. In 2018 Nevada accounted for 83 per cent. of the US’s total gold production.

According to the Nevada Mining Association (2022), as of November 2021, 11,000 people were employed by the metal mining sector within the state, with a Nevada Gross Domestic Product contribution of US$3.2 billion in 2020.

Projects with Critical and High-Demand Minerals:

The Company’s 100% owned Pilot Mountain Project (“Pilot Mountain”) hosts a tungsten-copper-silver-zinc Mineral Resource Estimate (MRE) which includes 12.53Mt at 0.27% W03 (tungsten tri-oxide) with significant copper-silver-zinc credits. Tungsten is an in-demand and critical metal as outlined below:

·         Tungsten is included in the British Geological Survey’s UK Critical Minerals list (2022), the US Geological Survey’s (USGS) Critical Minerals list (2022) and the European Commission’s Critical Raw Materials list (2020).

·         The global demand for tungsten is forecast to rise annually (3-7 per cent. per annum according to the British Geological Survey) and is predicted to outstrip available supply, which is likely to place continued upward pressure on prices in the near-term.

Management Team:

A proven management team with:

·         a broad spectrum of knowledge and capabilities;

·         substantial technical and listed company experience; and

·         extensive North American operating experience with connections to various in-country consulting teams.

Diverse Project Base:

The Golden Metal portfolio consists of four Nevada based projects (collectively the “Nevada Projects”) comprising the Pilot Mountain Project and three exploration stage projects: the Golconda Summit Project (gold), the Garfield Project (copper-gold-silver) and the Stonewall Project (gold-silver).

The Nevada Projects are all well located within major metallogenic belts containing active, globally important precious- and base-metal mining operations. All the assets have favourable geology which is prospective for skarn, carlin, epithermal and porphyry deposit types.  The portfolio is focussed on tungsten, gold, silver and base metal mineralisation.

In particular, the Pilot Mountain Project offers significant exploration upside potential as well as the opportunity for Golden Metal to de-risk the Project on a number of fronts. These include building on the existing MRE, furthering and updating technical studies relating to the potential development of the known resources, further permitting, making relevant grant applications, including to the DOD Defence Production Act (DPA) Title III grant office as well as commodity marketing and further metallurgical studies.

In total, the Nevada Projects cover a combined area of approximately 22.83 km2.

Oliver Friesen, CEO of Golden Metal, commented: 

Golden Metal’s admission to AIM comes at a time when it is clear that the world needs more critical, precious-and base-metals. This represents an exciting opportunity for a company such as ours with ownership of four diverse exploration and development assets located wholly within one of the top mining jurisdictions in the world. I believe that our Pilot Mountain Project, with its tungsten MRE, offers the greatest potential for exploitation, given that the US currently has no domestic primary production of the metal and is looking to reduce its heavy reliance on imports of critical metals from China. We are looking forward to actively pushing forward various exploration and corporate developments both within the US and UK and will provide further updates to the market on these various plans in due course.

I would like to thank all of the Golden Metal team and pre-IPO investors for their patience as we methodically worked through the various exploration and corporate developments which have led the Company to the exciting position it is in now. “

Background

Golden Metal is a mineral exploration company focused on tungsten, gold, copper, silver and zinc within Nevada, USA. It was established for the purpose of holding all of the Nevada mining assets of Power Metal Resources plc (“Power Metal”) and progressing the exploration and development of those assets. The Company holds four mining assets comprising the 100% owned Pilot Mountain, Garfield and Stonewall Projects together with an earn in option over the Golconda Summit Project. Each Project consists of unpatented lode mining claims located entirely on land managed by the United States Bureau of Land Management.

The Directors believe that the combination of a suite of high-quality, diversified Nevada based mining assets within a single, US-focused AIM-quoted vehicle creates a compelling investment opportunity. It is their opinion that the Nevada Projects hold several underexplored, highly prospective tungsten, gold, copper, silver and zinc exploration targets. The Directors consider that the Pilot Mountain Project has the potential to increase its existing tungsten focused MRE and to expand on multiple tungsten, copper, silver and zinc-rich zones identified by minimal historical drilling. In addition, the Directors consider that the Golconda Summit Project has the potential for a major gold discovery to follow the identification of significant surface gold mineralisation during a 1989 trenching programme. Accordingly, the Company’s exploration focus will be on these two projects but the Directors also believe there is potential value to be realised at the Garfield and Stonewall Projects.

On 8 April 2022, the Company raised £750,000 through a pre-IPO Financing at a price of 6.67 pence per Ordinary Share, following which Power Metal held 83.13 per cent. of the existing ordinary shares. On Admission, Power Metal will hold 62.1 per cent. of the Company’s enlarged share capital.

Placing, Subscription, Acquisition and Use of Proceeds

The Company has raised gross proceeds of £1,982,000 through a placing and subscription through the issue of 12,449,208 Placing Shares and 10,868,435 Subscription Shares at a price of 8.5 pence per share.

The net proceeds from the Placing and Subscription will be used by the Company to:

·         provide funding for the Company to further explore and develop the Nevada Projects; and

·         provide the Company with ongoing working capital to support its business operations.

Warrants

Together with every two Placing Shares and every two Subscription Shares, each Placee and Subscriber will also be granted one warrant entitling the holder to subscribe for one further new Ordinary Share at 10.75 pence per Ordinary Share, for a period of 12 months from Admission, and one warrant entitling the holder to subscribe for one further new Ordinary Share at 17 pence per Ordinary Share, for a period of 24 months from Admission. Further details of the warrants are set out in Part VI of the Company’s AIM admission document.

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014 (which forms part of domestic UK law pursuant to the European Union (Withdrawal) Act 2018).  

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company’s or any third party’s ability to execute and implement future plans, and the occurrence of unexpected events. 

Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

For further information visit www.goldenmetalresources.com or contact the following:

Golden Metal Resources plc

Oliver Friesen (CEO)

Tel: +44 (0) 20 7583 8304

Cairn Financial Advisers LLP

Nominated Adviser

Sandy Jamieson/Jo Turner/Louise O’Driscoll

Tel: +44 20 7213 0880

First Equity Limited

Broker

Jonathan Brown/Jason Robertson

Tel: +44 20 7374 2212

 

The Projects:

Pilot Mountain Project

The Pilot Mountain project is an advanced exploration and mineral resource definition stage project located in Mineral County in western Nevada. The project covers an area of 14.80 km2 (3,656.1 acres) and is located 200km southeast of Reno and 18km east of Mina, Nevada. It is well situated for the supply of power, water and skilled labour and proximity to transport infrastructure in Mineral County and is centred around four existing mineral deposits: Garnet; Good Hope; Gunmetal and Desert Scheelite, all of which possess significant skarn-style tungsten-copper-silver-zinc mineralisation. The Pilot Mountain project consists of 176 active lode mining claims and 4 filed mill site claims. The four mill site claims filed at the former Dunham mill site have secure access to groundwater supply sufficient for the proposed project.

Golconda Summit Project

Golden Metal is the operator of the Golconda Summit project, which is held under an earn-in right to acquire up to 100 per cent. of the project from the mineral claim owner pursuant to an option agreement. The Golconda Summit project is an exploration stage gold and silver project located in Humboldt County and situated at the confluence of the Getchell and Battle Mountain – Eureka metallogenic trends, and consists of 44 lode mining claims, covering a total area of approximately 3.22 km2 (795.4 acres) located approximately 27km east of Winnemucca.

Garfield Project

The Garfield project is an early exploration stage copper, gold and silver property consisting of 39 lode mining claims covering 3.23 km2 (797.9 acres) located in Mineral County, Nevada, approximately 14km due east of the town of Hawthorne and 120km due west-northwest of Tonopah.

Stonewall Project

The Stonewall project is an exploration stage gold-silver property prospective for epithermal gold-silver mineralisation. The property consists of 19 lode mining claims covering 1.59 km2 (392.5 acres) located on the northern flank of Stonewall Mountain, on the western edge of the Nellis Airforce Range Restricted Access Area, in Nye County, Nevada, approximately 24km south-east of the historic gold mining town of Goldfield and 60km due south of Tonopah.

#BRES Blencowe Resources PLC – Bulk Sampling Complete

Highlights

·    100 tonne bulk sample mining completed.

·    Transport underway to Chinese graphite processing specialist Jilin Huiyang New Material Technology Company Ltd (“Jilin”) for final metallurgical testing in its existing facilities.

·    Additional 150kgs sample already sent to Jilin for initial off-site testing.

·    Ugandan Government had approved landmark one-off permit for Blencowe to export bulk sample graphite from Orom-Cross earlier in Q1 2023.

Blencowe Resources Plc (“Blencowe Resources” or the “Company”) (LSE: BRES) is pleased to announce it has completed the mining and packaging of both the 100t bulk sample and 150kg of sample from its flagship Orom-Cross Graphite Project. In January 2023 the Company received an approval from the Ugandan Ministry of Energy and Mineral Development to export materials from its Orom-Cross Graphite Project to Chinese testing facilities to enable final bulk metallurgical test work to be undertaken.  Blencowe has mandated industry specialist Jilin to complete this test work in their existing plant facility, negating the requirement for the Company to build its own bulk testing facility on-site in the near term, saving both considerable time and cost.

This final stage of metallurgical test work is a key component of the ongoing Definitive Feasibility Study.  Blencowe has already proven twice (in Canada/SGS and Australia/IMO) that it can achieve a high grade, low impurity 97% LOI concentrate from a composite mix of its two deposits at Orom-Cross. The Company expects to achieve the same results with this significantly larger sample size, thereby enabling the pre-qualification of end products and subsequent entry into binding offtake contracts.

Works to excavate and transport the bulk samples were undertaken under supervision of the Company’s geologists and the Ugandan Department of Geology, Survey and Mines (DGSM). Works were carried out by local Uganda firm ADT/LogVoy. The 100t bulk sample and the 400litres of groundwater are being sea-freighted from the Port of Mombasa, and the 150kgs of same samples are being fast-track air-freighted to same Jilin facility, to undergo metallurgical testing as a precursor to build knowledge before the larger samples arrive.

Once this bulk sample test is completed over the next few months Blencowe will utilise these same facilities to lift the 97% concentrate to a 99.95% SPG-ready product, which can then be tested by OEMs to ensure it meets their requirements.  When this OEM testing is successfully completed binding offtake contracts may then be secured.  In parallel Blencowe will also be doing same 99.95% SPG-ready testing in USA to obtain a separate qualification with another technical industry expert, thereby ensuring the widest range of offtake partners are available to the Company.

 

Cameron Pearce, Executive Chairman commented;

Our process to secure end-product qualification, which then opens the door to binding offtake contracts, is underway.  This is a methodical process designed to deliver an end-product that meets the most stringent battery grade testing by the OEMs.  We are very confident in the product to be produced from Orom-Cross, especially given the lack of impurities within the concentrate in all testing thus far.  If we can continue to demonstrate this quality in the months ahead we will be in excellent shape to complete this pre-qualification process.”

 

He added “The pre-qualification process remains a barrier to entry for many would-be graphite producers, as achieving the battery level quality the OEMs require is challenging.  However, based on historical test results we are confident we will achieve this and, in doing so, place Orom-Cross as one of the highest quality graphite projects worldwide.

 

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Financial

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavirasecurities.com

 

First Equity Limited

Jason Robertson

Tel: +44(0)20 7330 1833

jasonrobertson@firstequitylimited.com

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

#BRES Blencowe Resources PLC – Final Metallurgical Testing Programs

Commencement of Final Metallurgical Testing Programs for Orom-Cross Graphite Project as samples sent to both China and USA.

Highlights

·    20kgs of concentrate sent by air to technical experts Wuhan University of Technology (“WUT”) in China to begin final metallurgical test procedure.

·    This concentrate is the end product recently produced by IMO in Perth, which demonstrated high grade and low impurity chemical characteristics.

·    Preliminary testing on the 20kg sample to commence immediately in China ahead of 100-tonnes bulk sample studies, which will be sent to China in the near term.

·    Additional 5kgs of concentrate sent to leading US graphite technical firm American Energy Technologies Co. (“AET Co”) for SPG and expandables testing and to confirm Orom-Cross concentrate further upgrades efficiently to a >99.95% battery grade product.

Blencowe Resources Plc (“Blencowe Resources” or the “Company”) (LSE: BRES) is pleased to announce it has air-freighted 20kgs of concentrate from its Orom-Cross Graphite Project (“Orom-Cross”) to WUT in China, to commence final stage metallurgical testing.  Studies on this 20kgs concentrate, which was recently processed through the IMO test facility in Perth, will further define the characteristics of the Orom-Cross graphite product and is expected to ultimately lead to identifying offtake parties and thereafter signing binding offtake agreements for the sale of graphite concentrate.

WUT specialises in testing final concentrate products and defining their characteristics, in order to fine tune processing options and assess upgradability for use in batteries and other high value end applications. WUT works in close association with Jilin Huiyang New Material Technology Company (“Jilin”) who, as announced on 11 January 2023, are to receive 100 tonnes of raw material from Orom-Cross over the next few months to process through their existing processing facilities.  Blencowe will also send 150kgs of raw material to Jilin by air-freight as a precursor to the main bulk sample.

By sending this 20kgs prior to the 100 tonnes bulk sample Jilin will be able to better understand the properties and chemical characteristics of the Orom-Cross concentrate and will be able to adjust their pilot processing facility accordingly to take in the larger scale raw product when it arrives later. This testing by WUT/Jilin is expected to reconfirm historic results, which have demonstrated the concentrate from Orom-Cross is of a consistently high quality.

Once the 100 tonnes raw material is processed through Jilin’s facility it is anticipated that ~6 tonnes of high quality concentrate will be produced. This will represent a sample scale that is ~600 times larger than the 4Q 2022 IMO testing done in Perth and will confirm a high quality concentrate can be delivered in bulk from the Orom-Cross Project.  This is key to pre-qualification and securing future offtake agreements.

Jilin is also expected to use some of the ~6 tonnes concentrate to conduct spheronised purified graphite (SPG) testing, where the Orom-Cross concentrate is lifted from a 96-97% LOI to a >99.95% end product.  Once this is achieved and the OEM’s complete their own testing then Orom-Cross product may be deemed as pre-qualified and the Company will look to enter into binding offtake agreements for sale of products.

Blencowe is also now sending an additional 5kgs of concentrate to Chicago-based graphite specialist AET Co, which is a recognised industry expert in SPG and expandability testing.  AET Co has been directly involved in the upgrading of graphite concentrates for over a decade and is generally accepted as one of the leading technical specialists in graphite worldwide.  Blencowe will have a parallel test process occurring to ensure that it ultimately achieves the best possible outcome for upgrading concentrate to the >99.95% SPG product.  The AET Co testing is expected to take around 3 months to complete, after which Blencowe will know its end product has been tested all the way through to (lithium-ion) battery grade product.  Testing will also be done on the coarse flake products to ensure they are suitable for expandability, which will ultimately lead to offtake contracts for this higher-value product class also.

As lithium-ion batteries are expected to be the single most important demand pull for graphite ahead, completing QAQC to become certified as battery grade will be a significant milestone. Blencowe is confident its concentrate will successfully be highlighted as a low cost and pure SPG product once these tests have been completed, thereby commanding the best pricing.

 

Cameron Pearce, Executive Chairman commented;

We are now moving into the final stage of the Orom-Cross metallurgical work within the Definitive Feasibility Study, where our high quality 96-97% LOI concentrate will be upgraded to a more purified >99.95% product.  Beyond that there is only testing as required from the OEMs themselves to verify all data and if successful thereafter we can move to offtake agreements.  We are confident that our Orom-Cross concentrate will be verified ahead as a high-quality end-product and look forward to sharing the results of all of these tests once they are completed.

 

He added “Graphite demand is lifting fast and we believe it will continue to do so ahead.  The higher the quality of the end product the more likely we can lock in sales agreements and the better the prices we will achieve.  We expect graphite demand to continue to rise and shortages to unfold as there are only a limited number of new graphite projects with suitable, qualified end product moving into production over the medium term, and most resource analysts are forecasting a substantial deficit from 2025 which they predict will become even more pronounced by the end of the decade.”

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Financial 

Jonathan Evans

Tel: +44 (0)20 3192 1733

Jonathan.evans@tavira.group

 

First Equity Limited

Jason Robertson

Tel: +44(0)20 7330 1833

jasonrobertson@firstequitylimited.com

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit.

A 21-year Mining Licence for the Project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe completed a successful Pre-Feasibility Study in 2022.  The Company has now moved into the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content, with only a small percentage of the overall deposit drilled to date. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

I would like to receive Brand Communications updates and news...
Free Stock Updates & News
I agree to have my personal information transfered to MailChimp ( more information )
Join over 3.000 visitors who are receiving our newsletter and learn how to optimize your blog for search engines, find free traffic, and monetize your website.
We hate spam. Your email address will not be sold or shared with anyone else.