Home » Posts tagged 'hr3 prospect'

Tag Archives: hr3 prospect

ECR Minerals #ECR – Highest grade Gold intercept yet revealed below Soil Anomaly at HR3, Bailieston

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on gold exploration in Australia, is pleased to provide an update on drilling at HR3 including the highest grade Gold intercept yet below the soil anomaly drilled by hole BH3DD027.

ECR Minerals plc has 100% ownership of the Bailieston Project (EL5433) which contains the gold prospects known as HR3, Cherry Tree, Blue Moon and Black Cat. The projects are operated by ECR’s Australian wholly owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

ECR Chairman David Tang commented: “A significant amount of work has gone into the drilling programme at HR3, and I am delighted that having seen encouraging and consistent gold grades in the assay results to date, today’s result has provided our best intercept yet. Our team hoped that the ground under Hard-Up Reef would reveal a solid result – and it didn’t disappoint!”

“I look forward to working with our new CEO Andrew Haythorpe and Geologist Adam Jones as we build the results from BH3DD027 into the Maori Anticline target model.”

ECR CEO Andrew Haythorpe added: “As the new CEO my work for the next few weeks entails getting my feet under the proverbial desk. Regardless, given my previous experience as geologist and mining company CEO, along with David and Adam I am very pleased to see the HR3 prospect return the best assay result to date. I look forward to speaking with shareholders as the year progresses.”    

HIGHLIGHTS:

  • ECR Minerals has received the highest single assay result to date from the drilling at Bailieston with 0.2m @ 52.5 g/t Au from 126.3m depth in hole BH3DD027 (reported drilled thickness).
  • Hole BH3DD027 represents assays received from the first of two holes initially drilled into the Hard-Up Reef underneath a previously identified soil anomaly.
  • Drilling continues in HR3 (Bailieston) strengthening the Maori Anticline target model with multiple narrow mineralised structures observed.

The following statements can be referenced to the following link, a plan showing the location of hole BH3DD027 and recently drilled targets awaiting results;

https://www.ecrminerals.com/images/2022/Fig1_220421

BH3DD027

ECR Minerals announced the identification of four soil anomalies respectively named (A, B, C and D) in the vicinity of the projected Scoulers and Hard-Up Reef lines (see RNS dated 23rd December 2021 “Bailieston (HR3) Soil Sampling Strengthens Mineralisation Model”). Two initial drillholes (BH3DD026 and BH3DD027) were drilled underneath soil anomaly ‘A’. Results for hole BH3DD027 have now been received with the results pending for BH3DD026.

ECR is both pleased and proud to report the best gold intercept to date at Bailieston with 0.2m @ 52.5 g/t Au from 126.3m depth (BH3DD027). This intercept is supported by lower grade foot-wall and hanging-wall mineralisation located between 124 metres and 127 metres drilled depth. Geological interpretation confirms this mineralisation coincides with the Hard-Up Reef. Visible Antimony sulphide (Stibnite) is also present within the shear zone. The best intercept of 52.5 g/t Au ties in with a laminated quartz vein with a stibnite-sulphide shear zone grading at 1.76 g/t Au. All anomalous grades are reported in Table 1 below.

Although mineralisation between 124 metres and 127 metres has a represented drilled width of 3 metres, the low-dip angle of mineralisation to the drill core represents the true width of mineralisation at approximately 0.79 metres, demonstrating that at least some of the mineralisation at HR3 will likely be of a high-grade, narrow-vein style gold deposit.

Table 1. Summary of drill intercepts containing reportable levels of gold greater than 0.1 g/t Au for BH3DD027 (*highlights in bold).

BH3DD027

From To Grade (g/t Au) Interval (m) Comment
35.7 36.4 0.41 0.7
49.8 50.8 0.19 1
65 65.75 0.23 0.75
88.2 89 0.43 0.8
124 124.6 0.13 0.6
124.6 125 0.58 0.4
125 125.6 0.51 0.6 Start of mineralised zone
125.6 125.9 0.47 0.3
125.9 126.3 1.76 0.5 Shear Zone with visible Stibnite
126.3 126.5 52.50 0.2 Visible Stibnite (Hard-Up Reef)
126.5 127 1.57 0.5 End of mineralised zone

 

CHANGE OF ASSAY METHOD

Visible Stibnite (Antimony Sulphide) has been observed to occur in some of the drillholes into the Maori Anticline. As gold has been the primary mineral of interest, earlier assay results from the drilling have not been analysed for the Antimony content. Until recently, the preferred assay method has been to leach the bulk 2 kg drill sample using a cyanide solution. This is followed by fire assay of the residual tails from the solution, thereby tracing any potential undissolved coarser gold particles. With the increasing importance of Stibnite, the Company has refined the assay method to include such metals as Antimony. Additionally, all samples will have an initial 50g fire assay with only bulk leaching amendable to samples that show trace gold levels. This will save costs and speed up results without compromising quality of the assay.

CURRENT DRILLING PROGRESS

Drilling has now been completed into selected zones of both the upper and north end of the known Maori Reef. Geological logging is confirming our understanding of the Maori Anticline and how the main Reef systems consist of narrow stibnite-sulphide veining propagating up through the fold. Recently drilled BH3DD034 suggests gold mineralisation is still open along strike to the north. Assay results from this drilling will assist in follow-up drilling as needed.

Currently, the drilling programme is designed to investigate Scoulers Reef and associated soil anomalies which run along strike, parallel to the Maori Anticline. Some of the drillholes will be extended to target the Maori Anticline at depth to aid geological interpretation.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0) 20 7929 1010
David Tang, Non-Executive Chairman

Andrew Haythorpe, CEO

Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0) 207 220 1666
Nominated Adviser

Katy Mitchell / Andrew de Andrade

SI Capital Ltd Tel: +44 (0) 1483 413500
Broker
Nick Emerson
Novum Securities Limited  Tel: +44 (0) 20 7399 9425
Broker

Jon Belliss

Blytheweigh Tel: +44 (0) 207 138 3204
Public Relations
Tim Blythe

 

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has eight licence applications outstanding including two licence applications lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at both the Bailieston (EL5433) and Creswick (EL6148) projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

 

https://mercatorgold.com.au/

 

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three licence applications covering 900 km2 covering a relatively unexplored area in Queensland, Australia.

 

https://luxexploration.com/

 

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

 

ECR holds a 25% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences.

ECR Minerals #ECR – Visible Gold Identified at HR3. Progress of Drilling Continues into the Maori Anticline Target

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on gold exploration in Australia, is pleased to announce a current update on drilling at HR3 including results and geological interpretation completed for BH3DD012, current drilling activities and future drilling plans within EL5433.

ECR Minerals plc has 100% ownership of the Bailieston Project (EL5433) and contains the gold prospects known as HR3, Cherry Tree, Blue Moon and Black Cat. The projects are operated under ECR Minerals plc Australian wholly owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

ECR Chairman David Tang commented: ““A significant amount of work has gone into the drilling programme at HR3, and I am delighted to note that following on from the results at hole BH3DD019, we continue to see encouraging and consistent gold grades in BH3DD012 and visible gold in BH3DD034. Importantly we continue to build on our understanding of the Maori Anticline and the regional gold trend ahead of an infill drilling programme.”

“I know Adam and his team are excited by the potential at the Blue Moon prospect, and I look forward to reporting back to you once work commences there.”

“Finally, regarding our search for a new CEO, I am pleased to report we have shortlisted three candidates and we will provide updates to the market in due course, as required.”

HIGHLIGHTS:

  • Diamond drill hole BH3DD012 was drilled 100m south and parallel to the previously announced hole (BH3DD019). Five mineralised zones have been identified and correlated to the Maori Anticline.
  • The best intercepts within each of the five mineralised zones include 0.8m @ 3.81 g/t Au (Zone 1); 0.5m @ 3.87 g/t Au (Zone 2); 0.5m @ 4.26 g/t Au (Zone 3); 0.6m @ 2.25 g/t Au (Zone 4) and 1m @ 0.51 g/t Au (Zone 5).
  • Drilling and sampling of holes BH3DD032, BH3DD033, BH3DD034 and BH3DD035 are currently in progress to follow up best gold intercepts found in BH3DD019. Visible gold has been identified in BH3DD034 at 149.5m downhole.

 

This announcement is written to reference to the following three figures:

Fig 1: BH3DD012 geological section:

https://www.ecrminerals.com/images/2022/fig1_BH3DD012.png

 

Fig 2: Location and plan of recent drilling with current status, HR3:

https://www.ecrminerals.com/images/2022/fig2_Current_drillplan_HR3.png

 

Fig 3: BH3DD034 visible gold

https://www.ecrminerals.com/images/2022/fig3_BH3DD034_vg.png

 

OVERVIEW OF BH3DD012

On 30 February 2022, ECR announced that a series of four holes (BH3DD012, BH3DD014, BH3DD020 and BH3DD021) had been drilled perpendicular to the trend of reef lines within the HR3 Goldfield to aid interpretation of the main faults and folding with known mineralisation. The Company has now received gold results for hole BH3DD012.

BH3DD012 was collared in 100m to the south and drilled parallel to adjacent hole BH3DD019. Geological interpretation is now revealing the main rock-type groupings and the style of mineralised veins that are associated with the Maori Anticline. MGA’s geology team has correlated the veins identified in BH3DD012 to hole BH3DD019, giving further understanding to the structural architecture of the HR3 Goldfield.

Five zones of mineralisation have been identified from hole BH3DD012. (Fig 1)

Zone 1 features a quartz stockwork zone hosted within a massive brittle sandstone rock unit that has a drilled thicknes of 2.7 metres. Best intercepts were 0.8m @ 3.81 g/t Au (from 57.3m) and 0.7m @ 3.32 g/t Au (from 59.3m)

Zone 2 can be linked to the Scoulers Reef structure represented by orthogonal veining within a sheared zone. Mineralisation is broad at a drilled width of 9.3 metres. Two of the highest intercepts included 1m @ 3.75 g/t Au (from 72m) and 0.5m @ 3.87 g/t Au (from 73.8m)

Zone 3 is represented by narrow bedding-laminated sulphidic veins at a drilled depth of 175.5m which returned 0.5m @ 4.26 g/t Au. The veins are hosted with a planar-laminated siltstone which correlates well to the same lithology in hole BH3DD019. Given this good correlation, it is highly probable Zone 3 veins match to the best intercept of 0.5m @ 9.5 g/t Au in BH3DD019 at 99.9m.

Zone 4 consists of a fault with linking stockwork quartz veining. Best result was 0.6m @ 2.25 g/t Au (from 191m drilled depth).

Zone 5 is a minor occurrence of bedded laminated carbonate veining at 255.6m drilled depth. Traces of stibnite (antimony sulphide) were identified in adjacent veining. This zone has only elevated gold, the best result being 1m @ 0.51 g/t Au (from 255.6m).

BH3DD012 was drilled to a depth of 302.1m. The dip angle of bedding, sedimentary depositional indicators (called younging) have located the hinge zone of the Maori Anticline at an approximate depth of 220m down the drill hole. The geology team is currently interpreting the projection of this hinge to the earlier drilling (BH3DD009) near surface.

Table 1. Summary of drill intercepts containing reportable levels of gold greater than 0.1 g/t Au for BH3DD012 (*highlights in bold). Mineralised ‘Zones’ shown in Fig 1.

BH3DD012

From To Grade (g/t Au) Interval (m) Zone
38 39 0.18 1
41 41.5 0.11 0.5
41.5 42.5 0.41 1
44.5 45.5 0.18 1
48.5 49.5 0.14 1
49.5 50 0.62 0.5
50 50.5 1.54 0.5
50.5 51 0.8 0.5
51 52 0.74 1
52 53 0.33 1
53.7 54.2 1.16 0.5
54.2 54.5 1.38 0.3
54.5 55.5 0.15 1
55.5 56.5 0.28 1
56.5 57.3 0.53 0.8
57.3 58.1 3.81 0.8 ZONE 1
58.1 58.9 1.25 0.8 ZONE 1
58.9 59.3 0.32 0.4 ZONE 1
59.3 60 3.32 0.7 ZONE 1
65 66 0.16 1
66 67 0.82 1
67 68 1.22 1 ZONE 2 (Scoulers Reef)
68 69 1.77 1 ZONE 2 (Scoulers Reef)
69 70 2.28 1 ZONE 2 (Scoulers Reef)
70 71 1.32 1 ZONE 2 (Scoulers Reef)
71 72 1.39 1 ZONE 2 (Scoulers Reef)
72 73 3.75 1 ZONE 2 (Scoulers Reef)
73 73.8 1.24 0.8 ZONE 2 (Scoulers Reef)
73.8 74.3 3.87 0.5 ZONE 2 (Scoulers Reef)
74.3 74.8 1.14 0.5 ZONE 2 (Scoulers Reef)
74.8 75.3 0.73 0.5 ZONE 2 (Scoulers Reef)
75.3 76.3 0.45 1 ZONE 2 (Scoulers Reef)
76.3 76.9 0.15 0.6
76.9 77.4 0.31 0.5
77.4 78 1.02 0.6
78 79 0.98 1
79.5 80 0.28 0.5
80 81 0.24 1
81 81.7 0.74 0.7
81.7 82.3 1.06 0.6
82.3 83 0.77 0.7
126.8 127.3 0.26 0.5
128 129 0.13 1
133.25 134 0.14 0.75
134 135 0.24 1
136 137 0.29 1
138 139 0.19 1
139 140 0.24 1
144 145 0.13 1
145 146 0.17 1
151.1 151.9 0.15 0.8
151.9 152.3 0.13 0.4
175 175.5 0.13 0.5
175.5 176 4.26 0.5 ZONE 3
176 177 0.21 1
183.3 183.8 0.18 0.5
187.3 188.3 0.13 1
189.2 190 0.11 0.8
190 190.3 0.11 0.3
190.3 191 0.16 0.7
191 191.6 2.25 0.6 ZONE 4
191.6 192.2 0.82 0.6
192.2 193 0.7 0.8
193 194 0.38 1
213.5 214 0.17 0.5
215 216 0.18 1
219 220 0.69 1
241.3 242 0.2 0.7
242 242.7 0.27 0.7
248 248.5 0.13 0.5
248.5 249.1 0.14 0.6
249.1 249.8 0.28 0.7
250.5 251 0.14 0.5
251.7 252 0.14 0.3
252 252.8 0.24 0.8
252.8 253.8 0.11 1
253.8 254.6 0.22 0.8
254.6 255.6 0.23 1
255.6 256.6 0.51 1 ZONE 5
256.6 257.6 0.33 1

 

BH3DD034-VISIBLE GOLD IDENTIFIED

Drilling of BH3DD019 showed narrow arsenic-stibnite veining emanating from the Maori Anticline. ECR is currently following up these targets by drilling four additional supporting holes (BH3DD032, BH3DD033, BH3DD034 and BH3DD035). Hole BH3DD033 and BH3DD034 has been completed, now awaiting sampling. BH3DD034 has drilled through a narrow-laminated vein 50mm wide showing a visible speck of coarse gold around 1mm in diameter (Fig 3). This is a typical example of a narrow ‘nuggetty’ vein and shows the low probability of drilling such mineralisation. The vein is supported by a broad halo of hydrothermal sulphide. This hole is in the process of being geologically logged in detail and sampled and further updates will be provided in due course.

FUTURE PLANS

ECR is now starting to see the benefits of utilising its own diamond drill rig operated by an ‘in house’ drill team. The team have been drilling an average of c.35m of good quality core per day, reducing the drill meterage rate compared to contracting out the work.

Since the beginning of 2022, the Company has drilled holes into the northern limits of the Maori Reef and drilled two initial holes under the southernmost soil anomaly underneath the Hard-Up Reef. The geological team is also eagerly awaiting outstanding assay results for drilling completed into the Maori and Hard-Up Reef intersection, which will tie in with the results of this announcement.

Upon completion of the complimentary holes to BH3DD019, we plan to move the drill rig up on the low ridgeline to begin initial drilling into the Scoulers Reef and under the other soil anomalies identified along this ridge. Locations of the planned drilling along with recent drilling is shown in Fig 3. Ultimately, we expect that the outcome of the diamond drilling will provide a detailed understanding of the relationship of veining to structures and the possible control on gold deposition within the veins. This is all preparation work for infill RC drilling at a later date.

Additionally, planning is well under way to follow up the RC drilling completed in 2019 over the nearby “Blue Moon” prospect, also on EL5433.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0) 20 7929 1010
David Tang, Non-Executive Chairman
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0) 207 220 1666
Nominated Adviser

Katy Mitchell / Andrew de Andrade

SI Capital Ltd Tel: +44 (0) 1483 413500
Broker
Nick Emerson
Novum Securities Limited  Tel: +44 (0) 20 7399 9425
Broker

Jon Belliss

Blytheweigh Tel: +44 (0) 207 138 3204
Public Relations
Tim Blythe

 

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has eight licence applications outstanding including two licence applications lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at both the Bailieston (EL5433) and Creswick (EL6148) projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

 

https://mercatorgold.com.au/

 

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three licence applications covering 900 km2 covering a relatively unexplored area in Queensland, Australia.

 

https://luxexploration.com/

 

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

 

ECR holds a 25% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences

ECR Minerals #ECR – Drilling Continues to Extend Gold Mineralisation within the Maori Reef

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on gold exploration in Australia, is pleased to provide results from hole BH3DD019, drilled into the north end of the Maori Reef within HR3 at Bailieston, Victoria, Australia.

ECR Minerals plc has 100% ownership of the Bailieston Project (EL5433), which is operated under its Australian wholly owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

ECR Chairman David Tang commented: “I am delighted to report that our team of geologists headed by Adam Jones are reporting some very encouraging gold grades at hole BH3DD019. Furthermore, the epizonal mineralisation identified through the drilling work and assay results correlates with nearby deposits at Costerfield, Nagambie and Whroo mine and this is assisting with our understanding of the regional gold trend as we work towards identifying a possible ore resource.”

“As outlined below, following COVID-19 delays the assay results are now starting to flow back to us, and I look forward to announcing further results in the coming weeks.” 

SUMMARY:

  • Assays from one drill hole (BH3DD019) now received. This is the deepest hole drilled under the north end of the Maori Reef and it has identified four mineralised zones. Best intercepts include 0.5m @ 9.5 g/t Au from 99.9m, 0.8m @ 4.96 g/t Au from 100.4m, 0.3m @ 4.59 g/t Au from 143.4m and 0.6m @ 6.15 g/t Au from 231.5m.
  • Geological logging of visible stibnite in holes drilled into the Maori Reef also correlates well with expectations of reportable gold.
  • Stibnite, arsenopyrite and gold mineralisation collectively identifies with an ‘epizonal’ style of mineralisation which is typical of the nearby deposits such as Costerfield, Nagambie and Whroo. 

BH3DD019

Hole BH3DD019, drilled into the Maori Reef at the northern limits of the historical gold workings was part of a series of 4 holes (including BH3DD012, BH3DD014, BH3DD020 and BH3DD021), designed to crosscut the HR3 goldfield to aid interpretation and identify the main faults and folding that is associated with gold mineralisation. Staffing issues at the laboratory due to COVID-19 outbreaks have resulted in slower than expected drilling reports and data over the new year period, but we are pleased to report that ECR is now starting to receive assay results from these overdue drillholes. To date BH3DD019 have been received, 3 holes are awaited.

A visual reference to the following geological notes regarding BH3DD019 is provided in figure 1:

https://www.ecrminerals.com/images/2022/Fig1.jpg

BH3DD019 was drilled due east at a dip of -58° from surface. Drilling ended at a depth of 279.5m. Geological logging of bedding has revealed a broad inclined hinge zone located around 120 metres down hole. The hinge correlates well to the inferred anticline zone which hosts the Maori Reef, and our hinge projections back up to the surface will become targeted in follow-up drilling. Two zones featuring an arsenic and antimony high within laminated quartz in faulted ground returned some of the best results including 0.5m @ 9.5 g/t Au from 99.9m followed by 0.8m @ 4.96 g.t Au from 100.4m depth. A similar zone was intersected on the east side of the hinge point where assays returned 0.3m @ 4.59 g/t Au from 143.4m. This last interval also included a visible solid stibnite vein with a drilled thickness of approximately 10cm wide.

A parasitic flexure causing two smaller hinges within the steeply east dipping bedding at 220m hosts perpendicular massive quartz veins ‘PMQ’ with interconnecting quartz stockworks. The PMQ veins form a fan pattern around the first hinge zone. Unfortunately, this hinge only carries low reportable levels of gold. Between the two parasitic hinges, a bedding laminated vein ‘BLQ’ carrying visible stibnite returned 0.6m @ 6.15 g/t Au from 231.5m downhole. The up-dip projection of this vein is not revealed at the surface and will be followed up with future drilling.

EPIZONAL MINERALISATION

Mineralisation formed at temperatures below 300°C often with associated arsenic and antimony sulphides visibly presented in drill core as arsenopyrite and stibnite is defined as ‘Epizonal’. MGA geologists are frequently recording such sulphides below the oxide level within the Maori Reef, a phenomenon that has also prompted the team to investigate how nearby gold deposits are mineralised. This investigation has shown that narrow stibnite veins with arsenopyrite have also been identified by adjacent tenement holders at the Costerfield Mine, the historic Nagambie Mine open pits and more recently at the historic Whroo Mine by ‘Mawson Gold’.

FUTURE PLANS

Geological interpretation of BH3DD019 is now providing an insight into the bigger picture of mineralisation within the HR3 Goldfield. With the assay results now flowing in more regularly, we are anticipating more targets to follow up. Although the drilling work undertaken to date is still very much in its infancy, the Directors note that no drilling campaign of this complexity and detail has ever been undertaken in this area previously. The Company’s objective is to identify the trends of gold mineralisation or ‘shoots’ and once completed, ECR expect to be able to complete an accurate assessment in regard to a possible ore resource.

ECR also recently reported that drilling into the Maori Anticline at the intersection of the Hard-Up Reef was continuing. These holes have been recently completed and assay results are awaited. Again, once completed the Directors anticipate these results will help towards identifying the gold trend.

The Company has also drilled two holes (BH3DD026 and BH3DD027) to investigate the ground underneath soil ‘anomaly A’ that was reported from soil sampling results in December 2021. Assays are also pending for these drillholes. The soil sampling also revealed three other anomalies associated with the central reef known as ‘Scoulers’ that are still to be followed up with drilling once the initial Maori Reef drilling is completed.

Table 1. Summary of drill intercepts containing reportable levels of gold greater than 0.1 g/t Au for BH3DD019 (*highlights in bold). Mineralised ‘Zones’ shown in figure 1.

BH3DD019

From To Grade (g/t Au) Interval (m) Zone
5.6 6.4 0.22 0.8
22.3 22.7 0.2 0.4
26.3 27 0.17 0.7
38.3 39.4 0.31 1.1 ZONE 1
39.4 39.9 0.39 0.5 ZONE 1
39.9 40.3 0.74 0.4 ZONE 1
47 48 0.12 1
48 49 0.49 1
49 50 0.14 1
51.8 52.3 0.17 0.5
52.3 52.9 0.26 0.6
54 55 0.14 1
55 56 0.27 1
56 56.8 0.28 0.8
56.8 57.5 0.15 0.7
57.5 58 0.11 0.5
58 58.7 0.2 0.7
58.7 59.2 0.16 0.5
60 61 0.11 1
61 61.5 0.23 0.5
61.5 62 0.23 0.5
76.3 76.6 0.11 0.3
90.5 90.9 0.12 0.4
92.7 93.4 0.12 0.7
93.4 94.3 0.2 0.9
95.3 96.2 0.14 0.9
96.2 96.7 0.25 0.5
96.7 97.5 0.22 0.8
97.5 98.4 0.76 0.9 ZONE 2
98.4 98.7 2.46 0.3 ZONE 2
98.7 99.2 3.16 0.5 ZONE 2
99.2 99.9 1.66 0.7 ZONE 2
99.9 100.4 9.5 0.5 ZONE 2
100.4 101.2 4.96 0.8 ZONE 2
101.2 101.7 0.64 0.5 ZONE 2
101.7 102.7 0.43 1 ZONE 2
102.7 103.4 0.13 0.7
103.4 104.4 0.18 1
105.4 106.4 0.11 1
107.4 108.4 0.12 1
116.2 116.7 0.32 0.5
124.1 124.9 0.11 0.8
131.6 132.3 0.2 0.7
132.7 133.4 0.19 0.7
137.1 137.8 0.11 0.7
142.7 143.4 0.22 0.7 ZONE 3
143.4 143.7 4.59 0.3 STIBNITE VEIN
143.7 144.5 0.2 0.8
164.1 164.4 0.19 0.3
165 165.6 0.13 0.6
165.6 166.2 0.76 0.6
166.2 167 0.14 0.8
173.4 174 0.46 0.6
197.6 198.4 0.13 0.8
215.8 216.4 0.15 0.6
222.1 223 0.18 0.9 Hinge Stockwork
223 224 0.11 1 Hinge Stockwork
224 225 0.14 1 Hinge Stockwork
225 226 0.29 1 Hinge Stockwork
226 227 0.38 1 Hinge Stockwork
227 228 0.35 1 Hinge Stockwork
228 229 0.21 1 Hinge Stockwork
231.5 232.1 6.15 0.6 ZONE 4
232.1 232.5 0.2 0.4 ZONE 4
232.5 232.9 0.94 0.4 ZONE 4
232.9 233.4 0.12 0.5
234 234.6 0.13 0.6
234.6 235.5 0.15 0.9
241 241.7 0.11 0.7

 

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0) 20 7929 1010
David Tang, Non-Executive Chairman
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd   Tel: +44 (0) 207 220 1666
Nominated Adviser

Katy Mitchell / Andrew de Andrade

SI Capital Ltd Tel: +44 (0) 1483 413500
Broker
Nick Emerson
Novum Securities Limited  Tel: +44 (0) 20 7399 9425
Broker

Jon Belliss

Blytheweigh Tel: +44 (0) 207 138 3204
Public Relations
Tim Blythe

 

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has eight licence applications outstanding including two licence applications lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at both the Bailieston (EL5433) and Creswick (EL6148) projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

 

https://mercatorgold.com.au/

 

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three licence applications covering 900 km2 covering a relatively unexplored area in Queensland, Australia.

 

https://luxexploration.com/

 

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

ECR holds a 25% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences.

ECR Minerals #ECR – Bailieston (HR3) Soil Sampling Strengthens Mineralisation Model

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on gold exploration in Australia, is pleased to announce that further to the HR3 drilling update announced on December 22nd, soil sample results from HR3 have identified further gold anomalies, giving further confidence in our previous geological interpretations for dilational jog zones within the HR3 goldfield at Bailieston, Victoria, Australia.

ECR Minerals plc has 100% ownership of the Bailieston Project (EL5433), which is operated under its Australian wholly owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

ECR Chairman David Tang commented: “I said yesterday that our understanding of the Maori Anticline and HR3 had grown exponentially: this understanding has taken a further step forward today with soil sampling results that not only show a growing and extending area of anomalies, but that also support the dilational jog model outlined by our head geologist Adam Jones at holes BH3DD009, BH3DD010 and BH3DD011.”

“Along with our geologists, the board are genuinely excited at the scale and development potential of HR3. I look forward to reporting further assay results to you as they become available.”

SUMMARY:

  • Gold assays from further soil sampling reveal four gold anomalies along strike of the Scoulers-Dan Genders Reef lines, with two of the anomalies within an area of limited to no historic gold workings.
  • One anomaly in association with the convergent of two Reef lines fits in with the dilational jog mineralisation model recently identified in BH3DD009, BH3DD010 and BH3DD011.

Soil analysis results for an additional 160 soil samples taken across the central portion of the HR3 goldfield have been received, resulting in the identification of four gold anomalies. Samples are spatially related to the strike extents of the NW striking Scoulers and Dan Genders Reefs and the NNE striking Hard Up Reef.

Six of the 160 samples returned gold values above 0.1 g/t Au. The majority of these samples are affiliated with moderate arsenic levels (As) and high antimony levels (Sb)

The locations referred to in the following paragraphs can be found at the following link (figure 1):

https://www.ecrminerals.com/images/2021/XXXXX

Table 1. Best results for 160 soil assays (above 0.1 g/t Au) in descending order. Also showing related levels of arsenic (As) and antimony (Sb).

 

Sample Number Au (g/t) As (ppm) Sb (ppm)
SC_092 0.79 158.5 789
SC_118 0.2 93.3 445
SC_142 0.145 67.5 306
SC_108 0.125 84.4 144
SC_098 0.122 104.5 41
SC_072 0.118 119 60

 

INTERPRETATION OF SOIL RESULTS

Anomaly A

Gold results have highlighted an anomaly associated with the south projection of the Hard Up Reef and its convergence with the Dan Genders Reef. Recent drilling of BH3DD009, BH3DD010 and BH3DD011 identified high grade gold formed within a dilational jog zone where the Hard Up Reef converges with the Maori Reef. Anomaly A has potential to be related to a similar mineralisation style. Drilling is planned to confirm this.

Anomaly B

This anomaly is situated central to the Scoulers and Dan Genders Reef lines. Ground truthing evidence shows this anomaly to be located within an area of very few historic gold workings. The company will follow up this anomaly with rock chip samples of quartz float on the sub-surface. Outcome of these results will decide on the best plan to test this location by drilling.

Anomaly C

Earlier this year (June 2020), the first soil results were released and revealed a spot anomaly of 3.75 g/t Au. This earlier best result is located at the north-east end of the trail of Anomaly C (refer to figure 1). With the additional results now received, the source of this trail can be traced back to the Scoulers Reef. There are the remains of a backfilled shallow historic shaft at the source area that by judgement of the size of the remnant mullock dump, appears to be less than 4 metres deep. There is potential to drill underneath the historic shaft.

Anomaly D

Anomaly D is located at the north end of the Scoulers Reef line. The Reef dips into deeper soils to the north as it approaches a local watercourse. As with Anomaly C, there are limited shallow historic workings at this location. Some of the highest results have been obtained in ground that has no influence from the historic workings, thereby indicating the possibility of shallow sub-cropping mineralisation. ECR has current drill permits to test this location, and it is our intention to drill Anomaly D as part of the current drilling campaign.

FORWARD LOOKING STATEMENTS

Planning soil sampling in areas of previous mining will always present challenges in regard to the interpretation of results. To minimise contamination of samples from disturbance at surface by previous mining, ECR geologists take care in offsetting samples to minimise these errors. Although prospecting has taken place in the area for over 100 years by miners during the gold rush era, the technology and methodology at our disposal today can deliver worthwhile anomalous results that in some cases can revive and create value from a previously dormant goldfield.

There is a palpable sense of excitement among our team of geologists as interpretation of the extensive exploration work achieved this year is now slowly revealing the area mineralisation and considerable potential for development.

The supporting Australian team is now on a brief holiday period, returning to full working capacity on the 4th and 5th of January 2022. We will still be receiving assay results from recent drilling surrounding BH3DD009, 010 and 011 over the holiday period. On our return to work, the team will prioritise to drill through Anomaly A to reveal if mineralisation is similar to BH3DD009, 010 and 011. Pending results for current drilling, the rig will then finish off testing the upper end of the Maori Reef Anticline before proceeding to test Anomalies B, C and D.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0) 20 7929 1010
David Tang, Non-Executive Chairman
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0) 20 7220 1666
Nominated Adviser
Katy Mitchell, Andrew de Andrade
SI Capital Ltd Tel: +44 (0) 1483 413500
Broker
Nick Emerson
Novum Securities Limited  Tel: +44 (0) 20 7399 9425
Broker

Jon Belliss

Blytheweigh Tel: +44 (0) 207 138 3204
Public Relations
Tim Blythe

 

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has eight licence applications outstanding including two licence applications lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at both the Bailieston (EL5433) and Creswick (EL6148) projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

 

https://mercatorgold.com.au/

 

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three licence applications covering 900 km2 covering a relatively unexplored area in Queensland, Australia.

 

https://luxexploration.com/

 

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

ECR holds a 25% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences.

ECR Minerals #ECR – Bailieston Drilling Update For Holes BH3DD010 and BH3DD011

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on gold exploration in Australia, is pleased to provide updated results from the initial first drill section across the ‘Maori’ Anticline target within HR3 at Bailieston, Victoria, Australia.

ECR Minerals plc has 100% ownership of the Bailieston Project (EL5433), which is operated under its Australian wholly owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

ECR Chairman David Tang commented: “We are pleased with the follow-up results for holes BH3DD010 and BH3DD011 at HR3. Our understanding of the Maori Anticline, along with the extent and types of mineralisation, has grown exponentially, and our team on the ground continues to work to a tight schedule and maintain our aggressive drilling programmes. Further assay results and data are due very shortly, and I look forward to sharing those with our shareholders as they become available.”

“As our search for a new CEO continues, our committee of directors, including myself, Trevor Davenport and Adam Jones continue to drive the business forward. I would also like to stress that we are all easily contactable should shareholders and investors have any queries during this transition period”

SUMMARY:

  • Assay results now received for holes BH3DD010 and BH3DD011, completing the first diamond drill section across the upper part of the ‘Maori’ Anticline.
  • Highest results are from hole BH3DD011 with 0.4m @ 4.65 g/t Au from 39.8m and 0.5m @ 6.97 g/t Au from 68m down-hole.
  • Three mineralised zones within each drill hole identified.
  • Structural observations from drill core show how dilational gold / antimony mineralised zones form at favourable intersections between NW and NE striking veins.

Assay results for a further two diamond holes across the first drilled section of the upper part of the ‘Maori Anticline’ target have now been received. These results follow-up ECR’s previous announcement released on the 29/11/2021 in regards to hole BH3DD009 where an initial successful result of 0.7m @ 28.06 g/t Au from 52.7m was recorded. Holes BH3DD010 and BH3DD011 were subsequently drilled on the same azimuth, but at two different angles to test the up and down dip continuance of the grade in BH3DD009.

The following link to the interpreted geological section for holes BH3DD009, BH3DD010 and BH3DD011 relates to the detailed information in the paragraphs below.

https://www.ecrminerals.com/images/2021/ECRsection.jpg

BH3DD010

Hole BH3DD010 was collared with a dip of -67 degrees. Three mineralised ‘zones’ have been drilled through with the best intercept of 0.9m @ 1.18 g/t Au from 64.4m down-hole. This intersection is part of a broader anomalous halo as shown as ‘Zone 2’ on the accompanying figure 1. Drilling passed through the Maori Anticline where drilling ended at a depth of 111.2m.

BH3DD011

BH3DD011 was drilled with a dip of -50.5 degrees from horizontal to a final depth of 102.2m. Three mineralised zones were also passed. The upper ‘Zone 4’ is a hanging-wall system to the Maori Reef. Interpretations from orientated drill core show this to be a linking quartz-splay system between the Hard Up and Maori Reef. Best intersection in Zone 4 was 0.4m @ 4.65 g/t Au from 39.8m depth.

The Maori Reef was intercepted as expected around 55m depth where a fault zone with complex folding on the immediate hanging wall was identified. This zone contained no significant intercepts. A broad quartz mineralised ‘Zone 5’ was encountered at 60.1m depth. Best intersection within Zone 5 was 0.5m @ 6.97 g/t Au from 68m depth. This intercept is supported by a lower grade halo with other results of 1m @ 2.68 g/t from 65.4m and 0.7m @ 2.05 g/t Aufrom 69m. Structural logging of veining through this zone shows the vein to strike NNE with a dip direction to the NW which correlates well to the cross-vein known as the Hard Up Reef. Further drilling passed a faulted system ‘Zone 6’ which returned a best grade of 0.5m @ 1.09 g/t Au. Drilling ended at 102.2m depth on the eastern dipping sediments of the anticline.

MINERALISATION MODEL REVEALED

Drilling of BH3DD009, BH3DD010 and BH3DD011 shows three broad mineralised zones that are accompanied by visual evidence of stibnite (a sulphide of Antimony). Relating to figure 1, orientated drill core shows that quartz mineralisation is bedding parallel in Zone 1 and Zone 2, oblique to bedding in Zone 5 and hosted in brittle faults between Zone 3 and Zone 6. Best intercepts from all three holes suggests the best gold developments have formed where structures are favourable to dilate adjacent to structures that compress and pinch as seen at 55m depth in BH3DD011. Stockwork veining and oblique structures to bedding also relate spatially to elevated gold values as seen in Zone 5 in BH3DD011 and the stockwork veining in BH3DD009. At the goldfield level of scale, there is a close spatial development of such structures within the acute angle of intersecting NNW and NE striking veining where a ‘wrench’ or dilational ‘jog’ develops. This pattern is also observable and outlined in plan view by the numerous historic mined trenches and pits across the HR3 goldfield. Information gleaned from drilling this first drill section may also apply to other similar lineation trends across the field.

Table 1. Summary of drill intercepts containing reportable levels of gold greater than 0.1 g/t Au for BH3DD010 and BH3DD011 (*highlights in bold)

BH3DD010

From (m) To (m) Grade (g/t Au) Interval (m) ‘Zone’
51.05 51.6 0.14 0.55 Zone 1
52.8 53.8 0.37 1 Zone 1
53.8 54.7 0.16 0.9 Zone 1
57.5 58.5 0.15 1 Zone 1
63.6 64.4 0.2 0.8 Zone 2
64.4 65.3 1.18 0.9 Zone 2
66.8 67.7 0.31 0.9 Zone 2
69.1 70 0.2 0.9 Zone 2
70 70.9 0.15 0.9 Zone 2
71.9 72 0.13 0.1 Zone 2
100 101 0.22 1 Zone 3
103.8 104.6 0.16 0.8 Zone 3

 

BH3DD011

From (m) To (m) Grade (g/t Au) Interval (m) ‘Zone’
2.5 2.8 0.11 0.3
35.2 36.2 0.37 1
39.8 40.2 4.65 0.4 Zone 4
40.2 41.2 0.39 1 Zone 4
55.5 56 0.13 0.5
56 56.5 0.19 0.5
57.7 58.2 0.11 0.5
60.1 61.1 0.11 1 Zone 5
61.1 62.1 0.11 1 Zone 5
62.1 62.7 0.12 0.6 Zone 5
62.7 63.7 0.17 1 Zone 5
63.7 64.7 0.13 1 Zone 5
64.7 65.4 0.24 0.7 Zone 5
65.4 66.4 2.68 1 Zone 5
66.4 67.2 0.91 0.8 Zone 5
67.2 68 1.81 0.8 Zone 5
68 68.5 6.97 0.5 Zone 5
68.5 69 0.96 0.5 Zone 5
69 69.7 2.05 0.7 Zone 5
69.7 70 0.86 0.3 Zone 5
73 74 0.11 1
82.5 83.5 0.11 1
88.4 89.1 0.16 0.7 Zone 6
89.1 90 0.21 0.9 Zone 6
90 90.7 0.71 0.7 Zone 6
90.7 91.2 1.09 0.5 Zone 6
91.2 91.6 0.35 0.4 Zone 6
94 95 0.13 1
95 95.8 0.67 0.8

 

FORWARD LOOKING STATEMENTS

With these results logged, MGA continues to drill the upper end of the Maori Reef system towards the north. First impressions of drill core continue to show visual indicators of mineralisation of pyrite, stibnite and to a lesser extent arsenopyrite. We will continue to report these results to the markets in the coming weeks.

As stated on the previous HR3 drilling update on November 29th 2021, MGA continued to engage the services of the same contract rig that completed drilling at Creswick at hole EL006148. MGA also decided to utilise its larger rig to complete orientated drill core over the broader HR3 goldfield. The contract drilling is now complete. Logging is still in progress for this drilling campaign, with initial results scheduled for release shortly. Follow-up drilling will commence using ECR’s owned and operated ‘Midas’ drill rig where appropriate.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0) 20 7929 1010
David Tang, Non-Executive Chairman
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0) 161 832 2174
Nominated Adviser
SI Capital Ltd Tel: +44 (0) 1483 413500
Broker
Nick Emerson
Novum Securities Limited  Tel: +44 (0) 20 7399 9425
Broker

Jon Belliss

Blytheweigh Tel: +44 (0) 207 138 3204
Public Relations
Tim Blythe

 

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has eight licence applications outstanding including two licence applications lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at both the Bailieston (EL5433) and Creswick (EL6148) projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

 

https://mercatorgold.com.au/

 

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three licence applications covering 900 km2 covering a relatively unexplored area in Queensland, Australia.

 

https://luxexploration.com/

 

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

ECR holds a 25% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences.

ECR Minerals #ECR – Initial Success of ‘Phase two’ Drilling at HR3

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on gold exploration in Australia, is pleased to update shareholders on its initial successful results from recently commenced ‘phase 2 drilling’ within HR3 at Bailieston, Victoria, Australia.

ECR Minerals plc has 100% ownership of the Bailieston Project (EL5433), which is operated under its Australian wholly owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

ECR Chairman David Tang commented: “We are pleased with the excellent results from hole BH3DD009 at HR3. As this intensive drilling campaign continues, so our understanding of the Maori Anticline continues to grow. With a clear picture of the HR3 goldfield structure starting to emerge, it is tragic that Craig Brown is no longer with us to see these latest developments. I do know that all employees and directors at ECR and Mercator Gold are working hard to ensure that Craig’s vision for ECR’s flagship projects come to fruition. We look forward to sharing further assay results and data with shareholders as they are released by the labs.”

“It is our intention to appoint a new CEO in due course, and in this regard our search has already begun. In the interim a committee of directors, including myself, Trevor Davenport and Adam Jones will continue to drive the business forward.”     

SUMMARY:

  • Following receipt of the necessary permissions, drilling has re-commenced within the HR3 Goldfields utilising two diamond drill rigs.
  • Initial results have been received with the first hole completed, (BH3DD009) returning 0.7m @ 28.06g/t Au from 52.7m depth from the Maori Reef.
  • Gold values correlate well to high arsenic and antimony (stibnite) pXRF values – proof of their importance as pathfinder elements within the Bailieston area.
  • Drilling highlights the importance of the Maori Anticline as an important up-coming target.

 

PHASE TWO DRILLING HR3

Whilst drilling at Creswick and Cherry Tree ‘HR4’ mid-year, MGA submitted plans to government authorities requesting permission to drill from additional sites within the HR3 goldfield area. After meeting regulatory requirements, permission was granted early October 2021. Once drilling at nearby Cherry Tree and at the Creswick tenements had completed, drill rigs were mobilised to HR3 to commence phase two drilling. Drilling is being undertaken by two diamond drill rigs, one by a contractor and the second rig being MGA’s owned and operated ‘Midas’ drill rig. The contract rig is currently drilling broad holes perpendicular to the strike of the main mineralised systems throughout the HR3 goldfield and has approximately 250m of drilling to complete. Follow-up drilling is being undertaken by the ‘Midas’ drill rig and will continue to the end of the year.

A total of twelve drill sites have been approved across HR3. The sites have been well planned to ensure optimum drill coverage across the remainder of the goldfield. Particular focus will be directed at gathering structural data by use of diamond drilling to reconstruct the central and eastern mineralised systems known as the Scoulers and Maori Reefs. Extensions to the north and south of the goldfield boundaries will also be drilled. Drilling will also delineate structures drilled by previous historic percussion drilling during the 1980’s period.

To date, a total of 1478m of ‘phase two’ drilling has been completed at HR3. Between the two drill rigs, good meterage has been drilled (up to 80m per shift). Geological logging and interpretation will continue to the end of the year. A summary of drilling locations and their progression is shown in the link below;

Figure 1

BH3DD009

Phase two drilling commenced with BH3DD009 across the central portion of the Maori Reef. Drilling was targeted to follow up the down-dip of an historical Reverse Circulation drillhole intersection which returned 1m @ 11 g/t Au. BH3DD009 was successful in drilling mineralisation between 47m and 56.7m depth and the best intersection was 0.7m @ 28.06 g/t Au from 52.7m depth.

Drill core is routinely analysed for pathfinder elements during geological logging using an in-house pXRF unit to trace pathfinder elements associated with gold mineralisation. pXRF results are not used for reporting resources, only for tracing the pathways for gold mineralisation fluids. Plotting of antimony (Sb) and arsenic (As) pXRF results correlates spatially with the initial high-grade gold intercepts. A similar zone of high Sb and As has been identified in other drillholes on the same section as BH3DD009 and on the projection of the Maori Reef structure (see fig 2). Gold assay are pending for these drillholes (BH3DD010 and BH3DD011) and whilst the XRF results can not be relied upon, we are anticipating good results.

The following is a link to a section sketch showing the main geological features of BH3DD009 and the spatial association of antimony and arsenic.

Figure 2

MAORI ANTICLINE

Drilling and subsequent 3D modelling of drillholes BH3DD005, BH3DD006 and BH3DD007 earlier this year revealed a moderate south plunging fold to exist underneath and along strike of the Maori Reef workings. This has been termed the Maori anticline. Observations show the historic mined portion of the Maori Reef coincides with the projected up-dip of the anticline near surface. The Maori Reef has been intersected midway between BH3DD009 and the historical workings by an historic percussion drill hole named BLP136.  BH3DD009 intercepted 1m @ 34 g/t Au from 44m depth. These observations show the significance of the anticline. The drill rig is currently being set up to test this unexplored gap of the Maori anticline.

A long-section looking east through the anticline is shown in the link below;

Figure 3

Table 1. Summary of initial drill intercepts containing reportable levels of gold greater than 1 g/t Au for BH3DD009

BH3DD009

From (m) To (m) Grade (g/t Au) Interval (m)
47 48 0.6 1
48.2 48.8 0.40 0.6
48.8 49.1 1.70 0.3
49.1 49.6 2.49 0.5
50.5 51.5 0.61 1
51.5 52.4 1.08 0.9
52.4 52.7 1.90 0.3
52.7 53.4 28.06 0.7
53.4 54.2 1.14 0.8
54.2 54.6 0.93 0.4
54.6 55.1 0.46 0.5
55.1 55.7 0.77 0.6
55.7 56.7 0.25 1
57.7 58.7 0.17 1
58.7 59.2 0.14 0.5
59.2 60.2 0.43 1

 

 

FUTURE WORK

The initial results for drill holes BH3DD010 and BH3DD011 are due shortly. Samples from these two holes are currently being processed at the laboratory, and we expect to deliver regular drilling updates in the run up to the Christmas period. While these results are still early in the campaign, the identification of the Maori anticline and its association with high-grade gold mineralisation will now be the main focus for the next drilling campaign.

Early observations of HR3 drill cores are revealing exciting structures that appear to correlate across the HR3 goldfield. Re-construction will be key to identifying gold mineralisation patterns. A 10cm solid antimony vein was observed in recently drilled BH3DD019 around 143m depth, and is on trend to be on the northerly strike of the Maori Reef at depth. MGA’s Bendigo-based geology department will continue to gather and assimilate project data.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0) 20 7929 1010
David Tang, Non-Executive Chairman
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0) 161 832 2174
Nominated Adviser
SI Capital Ltd Tel: +44 (0) 1483 413500
Broker
Nick Emerson
Novum Securities Limited  Tel: +44 (0) 20 7399 9425
Broker

Jon Belliss

Blytheweigh Tel: +44 (0) 207 138 3204
Public Relations
Tim Blythe

 

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has eight licence applications outstanding including two licence applications lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at both the Bailieston (EL5433) and Creswick (EL6148) projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

 

https://mercatorgold.com.au/

 

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three licence applications covering 900 km2 covering a relatively unexplored area in Queensland, Australia.

 

https://luxexploration.com/

 

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

ECR has earned a 25% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences.

 

 

 

 

 

 

ECR Minerals #ECR – Friday drilling update from the Bailieston project:

ECR Minerals #ECR Friday drilling update from the Bailieston Gold project in the Victoria Goldfields:

~ 8 diamond drill holes completed at HR3
~ Midas drill rig will shortly start work at the Cherry Tree prospect
~ sited c30km east of Fosterville Gold Mine

ECR Minerals #ECR – Core logging and processing at Bendigo regional headquarters

ECR Minerals #ECR – The team at ECR’s Victoria operating base and regional headquarters at Bendigo are working overtime logging and processing drill core samples arriving everyday from the Bailieston HR3 gold prospect drill programme.

ECR Minerals #ECR – Commencement of Drilling at Creswick and Bailieston Gold Project Update

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on Australia, is pleased to provide an exploration update for shareholders covering drilling and related activities underway across the Bailieston and Creswick gold exploration projects.

Both projects are located in the Victoria Goldfields, Australia and are 100%-owned by ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

Craig Brown, Chief Executive Officer, commented:

“We are pleased to now have drilling underway at two gold projects in the Victoria Goldfields, and we look forward to updating the market with assay results in due course.

Our drilling at Bailieston continues successfully using our in-house diamond drill rig and we look forward to assay results of recent holes, particularly following the initial geological review of the drill core.  Additionally, soil sampling from the HR3 area (see below) has identified very high gold grades in soils, further supporting the geological modelling and drill targeting.

With our strong cash position we have been able to expand drilling operations and have now commenced drilling at Creswick using external contractors.   We are very excited by the potential scale of the opportunity at Creswick and a larger scale drill programme at the project is something we have been eager to undertake.

We look forward to providing further updates in due course.”

COMMENCEMENT OF DRILLING AT CRESWICK GOLD PROJECT

In 2019 exploration drilling was undertaken at Creswick targeting gold mineralisation associated with quartz veins hosted in the Dimocks Main Shale (DMS).

The DMS is the hard-rock source of much alluvial and deep lead gold, with historical alluvial and deep lead production estimated at up to 2.5 million ounces in the Creswick/Berry lead system, and up to 11 million ounces in the entire Ballarat area, of which the DMS is a significant contributor.

A 2019 drill programme conducted by the Company tested circa 300 metres of the DMS trend, which extends over approximately 15 kilometres, 7 kilometres of which is covered by MGA’s granted exploration licence and two exploration licence applications.

MGA has engaged a contractor for a minimum of 1,200 metres of diamond drilling at Creswick, and the first drill hole in this programme is now underway.  It is planned to drill around 10 holes from drill sites located on State Forest land within exploration licence EL006184.

The drill sites for the current programme are approximately 2.2 km south along the DMS-trend from those used in MGA’s previous drilling programme at Creswick in 2019, individual samples from which returned assays as high as 80.97 g/t gold over one metre (announced on 5 November 2019).

PROGRESS AT BAILIESTON GOLD PROJECT

As previously announced, drilling is ongoing in the Historic Reserve #3 (HR3) area of the Bailieston project using ECR’s own diamond drill rig.  Assay results from the first four holes (BH3DD001 to 4) were announced on 20 April 2021.  Assay results and final geological interpretations are currently awaited in respect of four further holes (BH3DD005 to 8).

Hole BH3DD005 has targeted the Maori Reef, and holes BH3DD006 and 7 have targeted a hypothesised central anticline (as discussed in the Company’s announcement dated 20 April 2021). Hole BH3DD006 was also drilled to test the Dan Genders Reef. Initial geological interpretation of holes BH3DD005, 6 and 7 indicates that the hypothesised central anticline does exist and represents a favourable target for hosting gold mineralisation such as limb-thrust type vein systems.

SOIL SAMPLING

MGA has received the results from laboratory analysis of 229 soil samples taken across the central and eastern part of the HR3 area. These results are currently being plotted and analysed in comparison with results from portable X-Ray Fluorescence (“XRF”) analysis. The laboratory results include gold values up to 3.75 parts per million (equivalent to grams per tonne). The results will help identify potential extensions of and potential undiscovered veins running parallel to known reef systems and further updates will be provided in due course as appropriate.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc.  Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG).  He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0)20 7929 1010
David Tang, Non-Executive Chairman
Craig Brown, Director & CEO
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0)161 832 2174
Nominated Adviser
 

Novum Securities Limited

Broker

Jon Belliss

Tel: +44 (0)20 7399 9425
SI Capital Ltd Tel: +44 (0)1483 413500
Broker

Nick Emerson

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, and two licence applications lodged in eastern Victoria for the Tambo gold project. MGA is currently drilling at both the Bailieston and Creswick projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), MGA has the right to receive up to A$2 million in payments subject to future resource estimation or production at any of those projects.

ECR has earned a 25% interest in the Danglay gold project, an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, and holds a royalty on the SLM gold project in La Rioja Province, Argentina.

ECR Minerals #ECR – High-Grade Drilling Results at Bailieston Gold Project, Victoria Goldfields, Australia

ECR Minerals plc (LON: ECR), the gold exploration and development company, is pleased to announce high-grade drilling results from the Bailieston gold project in the Victoria Goldfields, Australia. The Bailieston project is 100% owned by ECR’s wholly owned Australian subsidiary Mercator Gold Australia (“MGA”).

Craig Brown, Chief Executive Officer of ECR Minerals plc, commented: “These are the first results generated by our new drilling rig, and to our knowledge they are also the first diamond drilling results ever obtained from the HR3 area. The extra geological insight afforded by diamond drilling will be of great use in vectoring further work, and this is an advantage which previous explorers have not had.

As is to be expected with early-stage exploration drilling, not all holes reported today have intersected significant gold mineralisation, but we are very encouraged by the fact that BH3DD001 returned two high-grade intercepts, including one of 0.5 metres at 19 g/t gold, and all holes have provided data which will feed into our evolving geological model for the area. Drilling is continuing and we look forward to reporting the next round of results.

We remain as excited as ever about the potential of the Bailieston gold project, which is located around 30 kilometres from the Fosterville gold mine owned by Kirkland Lake Gold and which includes the Blue Moon gold discovery confirmed by high-grade results from previous drilling by ECR.”

HIGHLIGHTS:

  • Five diamond drillholes across the Historic Reserve #3 (HR3) area covering the Byron and Maori reef lines have been completed for a total of 1082m. Drilling at Byron shows west dipping sediments whereas drilling at Maori intersected all east (and south-east) dipping beds, indicating the possibility of anticline-related gold mineralisation between the two reefs.
  • Drilling of BH3DD006 is currently in progress to test a hypothesised anticline that may exist in the vicinity of the Dan Genders-Scoulers line of workings. Historic shallow gold workings may be small reefs linking and coalescing to a much larger fault related anticline system at depth.
  • Drilling to date has been on the periphery of a central mineralised system (Byron and Maori Reef lines). Drilling has been through mostly shales, however sandy bedding, which is best for brittle vein development is expected to be more likely in the central part of the HR3 goldfield.
  • Drillhole BH3DD001 into the Byron Reef returned a high-grade intersection of 0.5m @ 19 g/t Au from 110.9m downhole. Furthermore, a potentially new mineralised system was intersected at 157m (1m @ 4.25 g/t Au). Rubbly quartz from this same intersection assayed 21.1 g/t Au.
  • Drilling of BH3DD005 into the Maori Reef shows an increase in sandy bedding and sulphide development compared to the Byron Mine area. Final assay results for this hole are pending.
  • Geochemical soil sampling has been completed over half of the HR3 goldfield. Some 720 samples have been taken with 229 samples currently being analysed for key gold pathfinder elements, and these results will assist with drill targeting.

SUMMARY OF DRILLING TO DATE

(fig. 1) – Plan showing locations of 2021 drilling, historical gold workings and reef lines.

https://www.ecrminerals.com/images/0421fig1.jpg

BYRON REEF

908m of the 1082m total drilling to date has been drilled into the Byron Reef surrounding the historic Byron Mine. Production records show the Byron Mine to have produced a total of 8698 tonnes for 4416 oz (average 15.5 g/t Au), indicating it was the biggest producer within the HR3 goldfield. On this basis and considering the relative ease of drilling access at Byron, holes BH3DD001 to BH3DD004 were drilled into this reef.

BH3DD001

This hole was designed to test the down-dip mineralisation underneath the historic Byron Mine and understand the structural context of the orebody. The target (Byron Main Reef) intersected a milky, massive-vuggy quartz reef with laminated margins, 5.3m in apparent thickness. A visible speck of gold was seen when sampling the core. Results show the laminated hanging-wall portion of this reef contains the gold with assay returning (0.5m @ 19.0 g/t Au) from 110.9m. The massive-vuggy portion of the reef did not return gold. Additionally, a newly discovered potential mineralised position occurs in thin, overturned sands containing perpendicular veins that returned (1m @ 4.25 g/t Au) from 157m. Furthermore, cave-in (rubbly quartz) resulting from a drill bit change within these veins at the same depth of 157m returned 21.1 g/t Au. Drilling continued into the footwall of the reef to end of hole at 296.6m depth. The entire hole was drilled down the western limb of a large anticline, likely to exist at an unknown distance to the east. A parallel reef system known as ‘Scoulers Reef’ may be situated on such an anticline.

BH3DD002

BH3DD002 was drilled to test the vertical down-dip extension of the Byron Main Reef intersected in BH3DD001. The reef was drilled through at 144m down hole where the vein had narrowed to 25cm in width. Assay results show no significant intercepts with gold below the detection limit (BDL). There is 40m in vertical difference between the reef intersection in BH3DD001 and BH3DD002. Drilling continued to test the hypothesis that the reef may be bedding-parallel and be dipping back under eastwards, however no additional quartz related mineralisation was intersected. No sulphides were visible and portable XRF (pXRF) readings failed to identify any significant pathfinder elements in the quartz or surrounding wall-rock. This hole ended at 242.5m depth.

(fig. 2) – Geological interpretation and best results are shown.

https://www.ecrminerals.com/images/0421fig2.jpg

BH3DD003

BH3DD003 was designed to test the hypothesised down-plunge shoot extension of the Byron Main Reef to the north of BH3DD001 and BH3DD002. In reference to the deepest known historical workings in the Byron Mine on long-section and the down-dip direction of mined stopes, the productive mineralised portion of the reef, known as a ‘shoot’ possibly plunges to the north (fig. 3). The reef was intersected at 126.3m downhole where flexures in the bedding caused a large body of quartz-sulphide development. This mineralisation continued to 147.5m. Best results were 0.8m @ 1.19 g/t Au from 135.8m depth.

https://www.ecrminerals.com/images/0421fig3.jpg

BH3DD004

BH3DD004 was drilled to test the vertical extent of the large quartz-sulphide dilation intersected in BH3DD003. The conclusion of this drillhole, as with BH3DD002, was that the width of the Byron Reef narrows and has no grade continuity at this depth.

(fig. 4) – Geological interpretation of BH3DD003 and BH3DD004 shown.

https://www.ecrminerals.com/images/0421fig4.jpg

MAORI REEF

BH3DD005

BH3DD005 was designed to test the structural context of the Maori Reef. Bedding is shown to be dipping towards the east and south-east directions. Between 76 and 151 metres the host rocks are more sand dominated and below this zone a 40cm wide laminated quartz vein was intersected. This hole was drilled to a final depth of 174.3 metres. Assays results are pending for this hole.

ANTICLINE HYPOTHESIS

BH3DD006

Drilling to date covers the western and eastern boundaries of the currently known mineralisation within the HR3 goldfield. Geological observations of drilling to date confirms the lithology of the bedding to be more sand dominant in the vicinity of the Maori Reef. Bedding dips towards the west at the Byron Mine and dips east to south-east at the Maori Reef, suggesting a main anticline hinge zone to exist between these two reef lines. It is likely the north-west striking Dan Genders Reef and Scoulers Reef systems may be linked to a potential larger anticline-system at depth. (refer to fig. 1 for reef locations). Similar anticline-related faulting is seen at the nearby old Bailieston open pit (located 2.8km to the north) and characteristic elsewhere in Central Victoria. BH3DD006 is currently being drilled across strike of the Dan Genders Reef to test this hypothesis.

(fig. 5) – Hypothesised Central Anticline Model.

https://www.ecrminerals.com/images/0421fig5.jpg

Table A Details of current drilling and significant intercepts to date (April 2021).

HOLE ID

EASTING (GDA

Zone 55)

NORTHING (GDA

Zone 55)

DIP

AZIMUTH (True North)

TOTAL DEPTH (metres)

SIGNIFICANT INTERCEPTS

BH3DD001

326313

5931394

-60

060

296.6

0.5m @ 19.0 g/t Au from 110.9m

1m @ 4.25 g/t Au from 157m*

*rubbly quartz from this zone re-assayed 21.1 g/t Au

BH3DD002

326313

5931394

-70

060

242.5

No significant intercepts (below detection limit)

BH3DD003

326313

5931394

-60

023

165.6

0.8m @ 1.19 g/t Au from 135.8m

BH3DD004

326313

5931394

-67

023

203

No significant intercepts

All samples were assayed by Gekko Systems Pty Ltd in Ballarat, Australia.

Review of Announcement by Qualified Persons

The Exploration Results in this report have been compiled by Adam Jones and Dr Rodney Boucher.

Adam Jones is a Member of the Australian Institute of Geoscientists (MAIG). Adam Jones has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. He consents to the inclusion in this report of these matters based on the information in the form and context in which it appears.

This announcement has been reviewed by Dr Rodney Boucher of Linex Pty Ltd. Linex Pty Ltd provides geological services to Mercator Gold Australia Pty Ltd, including the services of Dr Boucher, who has a PhD in geology, is a Member and RPGeo of the Australian Institute of Geoscientists and is a Member of the Australasian Institute of Mining and Metallurgy. Dr Boucher is a Qualified Person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 (MAR) (as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

ECR Minerals plc

Tel: +44 (0)20 7929 1010

David Tang, Non-Executive Chairman

Craig Brown, Director & CEO

Email:

info@ecrminerals.com

Website: www.ecrminerals.com

WH Ireland Ltd

Tel: +44 (0)161 832 2174

Nominated Adviser

Katy Mitchell/James Sinclair-Ford

SI Capital Ltd

Tel: +44 (0)1483 413500

Joint Broker

Nick Emerson

Novum Securities Limited

Tel: +44 (0) 20 7399 9400

Joint Broker

Jon Belliss

ABOUT ECR MINERALS PLC
ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, and two license applications lodged in eastern Victoria for the Tambo Gold project. ECR is currently drilling high priority targets on the Bailieston gold project using the Company’s own diamond drill rig, backed by a support network at the company’s central Victoria HQ at Bendigo. ECR has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), ECR has the right to receive up to A$2 million in payments subject to future resource estimation or production at any of those projects.

ECR has earned a 25% interest in the Danglay gold project, an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, and holds a royalty on the SLM gold project in La Rioja Province, Argentina.

I would like to receive Brand Communications updates and news...
Free Stock Updates & News
I agree to have my personal information transfered to MailChimp ( more information )
Join over 3.000 visitors who are receiving our newsletter and learn how to optimize your blog for search engines, find free traffic, and monetize your website.
We hate spam. Your email address will not be sold or shared with anyone else.