#AYM Anglesey Mining PLC – Half yearly report for the six months to 30 September 2025

Chairman’s Statement and Management Report

During the half year period, we were pleased to publish a conceptual study of a high-density fluid hydro-power energy storage project at the mine.

The findings of the conceptual study led to the commencement of a pre-feasibility study (PFS) in the energy storage scheme and we have published the proposed operational methodology and revenue streams associated with the project in terms of both Long Duration Energy Storge (LDES) and how that might be the catalyst for the commencement of mining of the Parys Mountain VMS mineral deposits.

Our investigations show there is a positive business case for the energy project on a standalone basis, that the risks identified thus far can be reasonably overcome or mitigated. Elements of the energy storage project scope, for example: the de-watering and refitting of the Morris shaft for material and personnel hoisting, the dewatering of the workings emanating from the Morris shaft 280m below the surface, the upgrading of the power-line to site, the on-going environmental and social studies and the deployment of impact avoidance, mitigation and compensation strategies, are each synergistic with the first steps of establishing a modern underground mine on Parys Mountain.

It is an essential and clear intent of the energy project that Anglesey Mining retains all the optionality that it currently has for the construction and commissioning of an underground mine, and that the hydro energy pumped storage project should not detract from those options over the medium and long term.

In the period to the 30th September 2025, we unfortunately had to announce the termination of our management rights and obligations over Grangesberg Iron AB (GIAB). Under a shareholders’ agreement our 100% owned subsidiary, Angmag AB, and therefore Anglesey Mining, had management rights with the ability to appoint the majority of the Board of GIAB. The Agreement had an initial term of 10 years from 28 May 2014, extendable on a year-to-year basis, unless terminated on one year’s notice. On 28 May 2024, Eurmag AB, which holds the remaining 50.2% of GIAB, gave notice of termination of the Agreement.

As at 31 December 2024, GIAB had loans outstanding to its senior debt holder of approximately US$9.0 million. Despite the best efforts of the Company, revised terms and conditions for the senior debt could not be arrived at such that the Board of Anglesey Mining could then explore the raising of funds to facilitate a settlement of this debt and therefore management of GIAB reverted to Eurmag AB, GIAB’s 50.2% shareholder, with Anglesey retaining its 49.8% ownership interest.

Post the end of the half year period, on 5 December 2025 the Company announced that it had entered into a binding letter of intent with its largest shareholder and largest creditor Energold Minerals Inc. whereby Anglesey will eliminate approximately £4 million of debt in exchange for its interest in GIAB and holding of Labrador Iron Mines Holdings Limited, reducing total outstanding debt to approximately £100,000.

Energold has also provided immediate funding to Anglesey of £350,000 through the purchase of non-voting exchangeable warrants.

The Board believes that the restructuring of the Company’s balance sheet, in addition to the investment of fresh funds by Energold, will place the Company in a materially stronger position from which to pursue its primary objective of advancing Parys Mountain.

Finally, at the beginning of December 2025, we were delighted to welcome Brendan Cahill and Jim Williams to Anglesey’s board.

Financial

The group had no revenue for the period. The loss for the six months to 30 September 2025 was £334,699 (2024 comparative period £311,052) and expenditure on the mineral properties in the period was £50,955 compared to £125,479 in the same period in 2024.

Net current liabilities as at 30 September 2025 were £370,085 compared to net current liabilities of £182,582 at 31 March 2025.

 

 

Andrew King

Chairman

19 December 2025

 

 

 

 

Unaudited condensed consolidated income statement

 Notes Unaudited six months ended 30 September 2025 Unaudited six months ended 30 September 2024
All operations are continuing                              £                            £
   Revenue  –  –
 Expenses  (236,591)  (213,575)
 Equity-settled employee benefits  –  (4,230)
 Investment income 883 2,169
 Finance costs  (98,957)  (95,384)
 Foreign exchange movement  (34)  (32)
 Loss before tax  (334,699)  (311,052)
 Taxation 8  –  –
 Loss for the period 7  (334,699)  (311,052)
 Loss per share   
 Basic – pence per share  (0.1)p  (0.1)p
 Diluted – pence per share  (0.1)p  (0.1)p

 

Unaudited condensed consolidated statement of comprehensive income

 Loss for the period    (334,699)  (311,052)
Other comprehensive income  
Items that may subsequently be reclassified to profit or loss:  
Change in fair value of investment 14  (449,562) 388,683
Foreign currency translation reserve 13,912 17,654
 Total comprehensive (loss) for the period  (770,349) 95,285

 

 

All attributable to equity holders of the company

Unaudited condensed consolidated statement of financial position

 Notes Unaudited 30 September 2025 31 March 2025
                 £                £
Assets  
 Non-current assets  
 Mineral property exploration and evaluation 9 17,043,457 16,992,502
 Property, plant and equipment 204,687 204,687
 Investments 10 777,119 1,226,681
 Deposit 129,727 128,857
18,154,990 18,552,727
 Current assets  
 Other receivables 35,358 36,988
 Cash and cash equivalents 43,791 44,264
79,149 81,252
 Total assets 18,234,139 18,633,979
Liabilities  
 Current liabilities  
 Trade and other payables  (449,234)  (263,834)
 (449,234)  (263,834)
 Net current liabilities  (370,085)  (182,582)
 Non-current liabilities  
 Loans  (4,231,211)  (4,046,102)
 Long term provision  (50,000)  (50,000)
 (4,281,211)  (4,096,102)
 Total liabilities  (4,730,445)  (4,359,936)
 Net assets 13,503,694 14,274,043
Equity  
 Share capital 11 10,359,056 10,359,056
 Share premium 12,910,853 12,910,853
 Currency translation reserve  (68,797)  (82,709)
 Retained losses  (9,697,418)  (8,913,157)
Total shareholders’ funds 13,503,694 14,274,043

 

 

All attributable to equity holders of the company

Unaudited condensed consolidated statement of cash flows

 Notes Unaudited six months ended 30 September 2025 Unaudited six months ended 30 September 2024
                             £                            £
Operating activities  
 Loss for the period  (334,699)  (311,052)
 Adjustments for:  
 Investment income  (883)  (2,169)
 Finance costs 98,957 95,384
 Share based payments charge  – 4,230
 Foreign exchange movement 34 32
 (236,591)  (213,575)
Movements in working capital  
 Decrease/(increase) in receivables 1,630 9,385
 Increase in payables 182,627 4,041
Net cash used in operating activities  (52,334)  (200,149)
Investing activities  
 Investment income 13 3
 Mineral property exploration and evaluation  (48,118)  (274,755)
Net cash used in investing activities  (48,105)  (274,752)
Financing activities  
 Issue of share capital  – 567,750
 Movements on loans 100,000  (29,207)
Net cash generated from financing activities 100,000 538,543
Net increase in cash and cash equivalents  (439) 63,642
 Cash and cash equivalents at start of period 44,264 219,685
 Foreign exchange movement  (34)  (32)
 Cash and cash equivalents at end of period 43,791 283,295

 

All attributable to equity holders of the company

Unaudited condensed consolidated statement of changes in group equity

 

 

 Share
capital
£
 Share
premium
£
 Currency translation reserve
£
 Retained losses
£
 Total
£
Equity at 1 April 2025 – audited 10,359,056 12,910,853  (82,709)  (8,913,157) 14,274,043
Total comprehensive
loss for the period:
Loss for the period  –  –  –  (334,699)  (334,699)
Change in fair value of investment  –  –  –  (449,562)  (449,562)
Exchange difference on
translation of foreign holding
 –  – 13,912  – 13,912
Total comprehensive
loss for the period
 –  – 13,912  (784,261)  (770,349)
Shares issued  –  –  –  –  –
Share issue expenses  –  –  –  –  –
Equity-settled employee benefits  –  –  –  –  –
Equity at
30 September 2025 – unaudited
10,359,056 12,910,853  (68,797)  (9,697,418) 13,503,694
Comparative period  
Equity at 1 April 2024 – audited 9,711,764 12,963,103  (89,589)  (8,097,527) 14,487,751
Total comprehensive
loss for the period:
Loss for the period  –  –  –  (311,052)  (311,052)
Change in fair value of investment  –  –  – 388,683 388,683
Exchange difference on
translation of foreign holding
 –  – 17,654  – 17,654
Total comprehensive
loss for the period
 –  – 17,654 77,631 95,285
Shares issued 635,000  –  –  – 635,000
Share issue expenses  –  (67,250)  –  –  (67,250)
Share issue expenses  –  –  – 4,230 4,230
Equity at
30 September 2024 – unaudited
10,346,764 12,895,853  (71,935)  (8,015,666) 15,155,016

 

All attributable to equity holders of the company

Notes to the accounts

1.  Basis of preparation

This half-yearly financial report comprises the unaudited condensed consolidated financial statements of the group for the six months ended 30 September 2025. It has been prepared in accordance with the Disclosure and Transparency Rules of the Financial Conduct Authority, the requirements of IAS 34 – Interim financial reporting (as adopted by the UK) and using the going concern basis. The directors are not aware of any events or circumstances which would make this inappropriate. It does not constitute financial statements within the meaning of section 434 of the Companies Act 2006 and does not include all of the information and disclosures required for annual financial statements. It should be read in conjunction with the annual report and financial statements for the year ended 31 March 2025 which is available on request from the company or may be viewed at www.angleseymining.co.uk/accounts.

The financial information contained in this report in respect of the year ended 31 March 2025 has been extracted from the report and financial statements for that year which have been filed with the Registrar of Companies. The report of the auditors on those accounts did not contain a statement under section 498(2) or (3) of the Companies Act 2006 and was not qualified. The half-yearly results for the current and comparative periods have not been audited or reviewed by the company’s auditor.

 

2.  Significant accounting policies

The accounting policies applied in these unaudited condensed consolidated financial statements are consistent with those set out in the annual report and financial statements for the year ended 31 March 2025. There are no new standards, amendments to standards or interpretations that are expected to have a material impact on the group’s results.

The group has not applied certain new standards, amendments and interpretations to existing standards that have been issued but are not yet effective. They are either not expected to have a material effect on the consolidated financial statements or they are not currently relevant for the group.

 

3.  Risks and uncertainties

The principal risks and uncertainties set out in the group’s annual report and financial statements for the year ended 31 March 2025 remain the same for this half-yearly period. They can be summarised as: development risks in respect of mineral properties, especially in respect of permitting and metal prices; liquidity risks during development; and foreign exchange risks. More information is to be found in the 2025 annual report – see note 1 above.

 

4.  Statement of directors’ responsibilities

The directors confirm to the best of their knowledge that:

(a) the unaudited condensed consolidated financial statements have been prepared in accordance with the requirements of IAS 34 Interim financial reporting (as adopted by the UK); and

(b) the interim management report includes a fair review of the information required by the FCA’s Disclosure and Transparency Rules (4.2.7 R and 4.2.8 R).

This report and financial statements were approved by the board on 19 December 2025 and authorised for issue on behalf of the board by Andrew King, interim chairman and Rob Marsden, chief executive officer.

 

5.  Activities

The group is engaged in mineral property development and currently has no turnover. There are no minority interests or exceptional items.

 

6.  Earnings per share

The loss per share is computed by dividing the loss attributable to ordinary shareholders of £0.3 million by 484 million – the weighted average number of ordinary shares in issue during the period. The comparative figures were a loss to 30 September 2024 of £0.3m divided by 442 million shares. However where there are losses the effect of outstanding share options is not dilutive.

 

7.  Business and geographical segments

There are no trading revenues. The cost of all activities charged in the income statement relates to exploration and evaluation of mining properties. The group’s income statement and assets and liabilities are analysed as follows by geographical segments, which is the basis on which information is reported to the board.

Income statement analysis

Unaudited six months ended 30 September 2025
       UK Sweden – investment Canada – investment        Total  
          £           £           £           £  
Expenses  (242,701) 6,110  –  (236,591)
Investment income 883  –  – 883
Finance costs  (92,235)  (6,722)  –  (98,957)
Exchange rate movements  –  (34)  –  (34)
Loss for the period  (334,053)  (646)  –  (334,699)

 

Unaudited six months ended 30 September 2024
         UK Sweden – investment Canada – investment        Total
            £           £           £           £
Expenses  (187,450)  (26,125)  –  (213,575)
Equity settled employee benefits  (4,230)  –  –  (4,230)
Investment income 2,169  –  – 2,169
Finance costs  (88,642)  (6,742)  –  (95,384)
Exchange rate movements  –  (32)  –  (32)
Loss for the period  (278,153)  (32,899)  –  (311,052)

 

Assets and liabilities

` Unaudited 30 September 2025
         UK Sweden investment Canada investment        Total
            £              £           £           £
Non current assets 17,377,871 633,170 143,949 18,154,990
Current assets 77,977 1,172  – 79,149
Liabilities  (4,370,796)  (359,649)  –  (4,730,445)
Net assets 13,085,052 274,693 143,949 13,503,694
 Audited 31 March 2025
         UK Sweden investment Canada investment Total
            £              £           £           £
Non current assets 17,326,046 633,170 593,511 18,552,727
Current assets 80,083 1,169  – 81,252
Liabilities  (3,993,161)  (366,775)  –  (4,359,936)
Net assets 13,412,968 267,564 593,511 14,274,043

 

8.  Deferred tax

There is an unrecognised deferred tax asset of £1.6 million (31 March 2025 – £1.6m) which, in view of the group’s results, is not considered to be recoverable in the short term. There are also capital allowances, including mineral extraction allowances, of £14.5 million (unchanged from 31 March 2025) unclaimed and available. No deferred tax asset is recognised in the condensed financial statements.

9.  Mineral property exploration and evaluation costs

Mineral property exploration and evaluation costs incurred by the group are carried in the unaudited condensed consolidated financial statements at cost, less an impairment provision if appropriate. The recovery of these costs is dependent upon the successful development and operation of the Parys Mountain project which is itself conditional on financing being available to fund such development. During the period activities were limited and no drilling took place.

 

10.  Investments

 

 Labrador  Grangesberg            Total  
           £            £            £     
At 1 April 2024 771,564 633,170 1,404,734
Net change during the period  (178,053)  (178,053)
At 31 March 2025 593,511 633,170 1,226,681
Net change during the period  (449,562)  (449,562)
At Unaudited 30 September 2025 143,949 633,170 777,119

 

Labrador – Canada

The group has an investment in Labrador Iron Mines Holdings Limited, (LIM) a Canadian company which is carried at fair value through other comprehensive income. The group’s holding of 19,289,100 shares in LIM (12% of LIM’s total issued shares) is valued at the closing price traded on the OTC Markets in the United States. In the directors’ assessment this market is sufficiently active to give the best measure of fair value, which on 30 September 2025 was 1 US cent per share (2024 – 8 US cents). As at 19 December 2025 the share price was 2 US cents per share.

 

Grängesberg – Sweden

The group has, through its Swedish subsidiary Angmag AB, a 49.8% ownership interest in Grängesberg Iron AB an unquoted Swedish company (GIAB) which holds rights over the Grängesberg iron ore deposits.

The directors assessed the fair value of the investment in Grängesberg under IFRS 9 and consider the investment’s value at 30 September 2025 to be £633,170.

 

11.  Share capital

 

     Ordinary shares of 1p        Deferred shares of 4p  Total  
Issued and
fully paid
 Nominal
value £
 Number      Nominal
value £
 Number  Nominal
value £
 
At 31 March 2024 4,200,931 420,093,017 5,510,833 137,770,835 9,711,764
Issued in the period 647,292 64,729,238  –  – 647,292
At 31 March 2025 4,848,223 484,822,255 5,510,833 137,770,835 10,359,056
Issued in the period  –  –  –  –  –
At Unaudited 30 September 2025 4,848,223 484,822,255 5,510,833 137,770,835 10,359,056

 

The deferred shares are non-voting, have no entitlement to dividends and have negligible rights to return of capital on a winding up.

 

 

12.  Financial instruments

 

 Group  Financial assets classified at fair value through other comprehensive income   Financial assets measured at amortised cost
   Unaudited 30 September 2025  31 March 2025  Unaudited 30 September 2025  31 March 2025
  £       £       £       £      
Financial assets  
 Investments 777,119 1,048,628  –  –
 Deposit  –  – 129,727 128,857
 Other receivables  –  – 35,358 36,988
 Cash and cash equivalents  –  – 43,791 44,264
777,119 1,048,628 208,876 210,109
Financial liabilities measured at amortised cost  
 Unaudited 30 September 2025  31 March 2025  
£       £        
 Trade payables  (179,123)  (107,559)
 Other payables  (270,111)  (156,275)
 Loans  (4,231,211)  (4,046,102)
 (4,680,445)  (4,309,936)

 

 

 

 

 

 

 

 

 

 

Anglesey Mining plc

 

Directors

Andrew King Chairman

Rob Marsden  Chief executive

Douglas Hall Non executive

Brendan Cahill Non executive

Jim Williams  Non executive

 

 

Registered office address – Parys Mountain, Amlwch, Anglesey, LL68 9RE

Phone 01407 831275       Email mail@angleseymining.co.uk

Registrars MUFG Corporate Markets, 29 Wellington Street, Leeds, LS1 4DL

Share dealing phone 0371 664 0445    Helpline phone 0371 664 0300

Company registered number 01849957

Web site www.angleseymining.co.uk

Shares listed    AIM – AYM

 

#AYM Anglesey Mining – Publication of a Conceptual Study of a High-Density Fluid Hydro-Power Energy Storage Project

Anglesey Mining is pleased to publish today, in conjunction with this RNS, a conceptual study of a high-density fluid hydro-power energy storage project at Parys Mountain.

The findings of the conceptual study indicate that there is a positive business case for the project, that the risks identified thus far can be reasonably overcome or mitigated and that the project will advance the delivery of a producing underground polymetallic mine at Parys Mountain.

Background

Anglesey Mining is focused on delivering a polymetallic underground mine at Parys Mountain. To that end, Anglesey’s management are developing strategies to enable investment in the development of Parys Mountain to be incremental, so far as practicable, thus allowing risks to be mitigated in stages before considering options for the next step of development.

Exploring the deployment of RheEnergise’s innovative High-Density Hydro® (HD Hydro) energy storage technology at the Parys Mountain mine site, using the mothballed underground workings and the Morris shaft which was excavated in 1989, fits with the incremental development approach.

Elements of the energy storage project scope, for example: the de-watering and refitting of the Morris shaft for material and personnel hoisting, the dewatering of the workings emanating from the Morris shaft 280m below the surface, the upgrading of the power-line to site, the on-going environmental and social studies and the deployment of impact avoidance, mitigation and compensation strategies, are each synergistic with the first steps of establishing a modern underground mine on Parys Mountain.

It is an essential and clear intent of this project that Anglesey Mining retains all the optionality that it currently has for the construction and commissioning of an underground mine, and that the hydro energy pumped storage project should not detract from those options over the medium and long term.

The energy storage project will initially market its products, which are energy storage and electricity grid stability services, to third parties. In the future the Parys Mountain mine may be in a position enter a long term energy offtake contract for the powering of the mine and processing plant, at that time mutually beneficial commercial terms will be explored as the energy storage supply and off-take will be in close physical proximity.

Pre-feasibility study

Anglesey Mining and RheEnergise have elected to immediately commence a Pre-feasibility study (PFS), the first part of which will assess a range of deployment and sizing options, as described in the conceptual study.

A key aspect of this study stage is to identify third party funders for the project including reviewing the range of government incentives available for R&D renewable energy storage projects, highlighting the link to the primary supply of critical minerals for the UK and the creation of jobs and associated economic activity.  The structure of how the project is owned, managed and funded is not fixed at this time, so that a bespoke structure can be arrived at that facilitates the third party funding, once identified.

 

Vision for the partnership between RheEnergise and Anglesey Mining.

From the early work done by RheEnergise and Anglesey Mining, it is clear that there are value enhancing options to be developed and explored through planning a non-caving method of underground mining, in combination with the deployment of high-density hydro energy storage.

  • There is an increasing justification for the deployment of on-site energy storage facilities at many mining sites. A consistent and reliable (firm) power supply is generally required not only to ensure  environmental, health and safety controls continue to be in place but also importantly for processing operations, because: firstly, re-starting machinery from an unexpected power outage is usually expensive, as it is hindered by having a high tonnage of in-plant inventory, and secondly there is a financial imperative to utilize the capacity of high-cost capital equipment.
  • It is likely that firm power will become disproportionally more expensive if a greater share of energy generation onto the power grid is sourced from intermittent renewable technologies, such as wind and solar.
  • This energy storage need is juxtaposed, at a typical mine site, with at least two physically unique advantages for deploying high-density hydro power storage: firstly, the core business of underground void creation, some portion of which may be re-purposed within the mining sequence as upper and lower fluid storage reservoirs and secondly, because the on-site processing facility normally generates waste fines in the form of tailings, which through an incremental process could be incorporated into the manufacturing of the high-density fluids required.

This high-density hydro power storage project, the first commercial deployment of RheEnergise’s innovative technology, proving it at technology readiness level 8, would facilitate the practical method by which the power necessary for the mine and processing plant comes from entirely renewable energy sources, both from new and existing suppliers, on the Isle of Anglesey.

Parys Mountain is the UK’s most advanced project for the primary mining of copper, lead, silver and zinc, which is on the Government’s critical minerals list.

 

The full version of the study can be accessed via the following link: https://www.angleseymining.co.uk/wp-content/uploads/2025/04/High-level-scope-issue-1-08_04_2025.pdf

 

For further information

RheEnergise    www.rheenergise.com / LinkedIn @rheenergise

Stephen Crosher, Chief Executive: sc@rheenergise.com

Philippa Rogers, Communications Manager: 07971 269559 / pr@rheenergise.com

 

Anglesey Mining plc – www.angleseymining.co.uk

Rob Marsden, CEO: 07531 475111 / rob.marsden@angleseymining.co.uk

 

About Anglesey Mining plc:

Anglesey Mining is traded on the AIM market of the London Stock Exchange and currently has [484,822,255] ordinary shares in issue.

Anglesey is developing the 100% owned Parys Mountain Cu-Zn-Pb-Ag-Au VMS deposit in North Wales, UK with a reported resource of 5.3 million tonnes at over 4.0% combined base metals in the Measured and Indicated categories and 10.8 million tonnes at over 2.5% combined base metals in the Inferred category.

Anglesey also holds a 49.8% interest in the Grängesberg iron ore project in Sweden and 11.9% of Labrador Iron Mines Holdings Limited, which through its 52% owned subsidiaries, is engaged in the exploration and development of direct shipping iron ore deposits in Labrador and Quebec.

For further information, please contact:

Anglesey Mining plc

Rob Marsden, Chief Executive Officer – Tel: +44 (0)7531 475111

Andrew King, Chairman – Tel: +44 (0)7825 963700

Davy

Nominated Adviser & Joint Corporate Broker

Brian Garrahy / Daragh O’Reilly – Tel: +353 1 679 6363

Zeus Capital Limited

Joint Corporate Broker

Katy Mitchell / Harry Ansell – Tel: +44 (0)161 831 1512

LEI: 213800X8BO8EK2B4HQ71

 

I would like to receive Brand Communications updates and news...
Free Stock Updates & News
I agree to have my personal information transfered to MailChimp ( more information )
Join over 3.000 visitors who are receiving our newsletter and learn how to optimize your blog for search engines, find free traffic, and monetize your website.
We hate spam. Your email address will not be sold or shared with anyone else.